12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT019110 – General Commissioning RequirementsIssue Date:October 17, 2012Page #:26 <strong>of</strong> 30A. Unforeseen Deferred Tests. If any check or test cannot be completed due to theproject completion level, required occupancy condition or other deficiency, execution <strong>of</strong> checklists and performance testing may be delayed upon approval <strong>of</strong> theCxA and CM. These tests will be conducted in the same manner as the seasonaltests as soon as possible. Services <strong>of</strong> necessary parties will be negotiated.B. Seasonal Testing. During the warranty period, seasonal testing (tests delayed until weather conditions are closer to the system’s design) shall be completed as part<strong>of</strong> this contract. The CxA shall coordinate this activity through the Owner/CM.Tests will be executed, documented by the CxA and deficiencies should be corrected by the appropriate contractor/ subcontractors with the CxA witnessing.Any final adjustments to the O&M manuals and asbuilts due to the testing shallbe made by the contractor.3.8 TRAINING OF OWNER PERSONNELA. The contractor shall provide training coordination, scheduling <strong>of</strong> subcontractors,and ensure that training is completed. All training shall be coordinated, throughthe CM, with the CxA witnessing activities.B. The contractor shall ensure that each subcontractor and vendor shall have the following responsibilities:1. Provide, to the CxA through the CM, a training plan sixty days before theplanned training covering the following elements:a. Equipmentb. Intended audiencec. Location <strong>of</strong> trainingd. Objectivese. Subjects covered (description, duration <strong>of</strong> discussion, specialmethods, etc.)f. Duration <strong>of</strong> training on each subjectg. Instructor for each subjecth. Methods (classroom lecture, manufacturer’s quality video, sitewalkthrough, actual operational demonstrations, written handouts,etc.).GENERAL COMMISSIONING REQUIREMENTS 01910 26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!