12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT15010 – Basic Mechanical RequirementsIssue Date:September 28, 2012Page #:7 <strong>of</strong> 13will be considered substitutions. As a minimum, any proposed substitution mustbe <strong>of</strong> similar physical size, capacity, construction, quality, features, andperformance characteristics as that <strong>of</strong> the scheduled manufacturers. In addition,the requirements <strong>of</strong> Division 1 Section “PRODUCT REQUIREMENTS" must besatisfied. The Contractor is responsible for the rearrangement <strong>of</strong> any work <strong>of</strong> histrade or any other trade to accommodate the proposed substitution. In general,substitutions will only be accepted if there is a demonstrated benefit to the Ownersuch as cost savings, energy savings, reduced maintenance, etc. The Contractormust clearly identify these benefits when submitting for a substitution inaccordance with Division 1.PART 2– PRODUCTS2.1 GENERALA. All materials and equipment shall be new and <strong>of</strong> the best quality and shallconform to standards and carry labels in every case where standards have beenestablished.B. To the maximum extent possible, all mechanical equipment for any one systemshall be the product <strong>of</strong> a single manufacturer. ENGINEER reserves the right todisapprove and reject equipment from various manufacturers when acceptablecomponents can be secured from fewer manufacturers and to require that source<strong>of</strong> materials be unified to the maximum extent possible.2.2 PATCH PAINTINGA. Any equipment or device that receives a factory coat <strong>of</strong> paint and is damagedduring installation, must receive touch painting. Clean and paint to match originalfinish, all items scratched or otherwise damaged.B. Field painting requirements, other than as needed to repair damaged paint onanything with a factory coat <strong>of</strong> paint, will be covered in the individualspecification section that covers the equipment.PART 3– EXECUTION3.1 INSPECTIONA. Prior to performing work required under Division 15, carefully inspect all existingBASIC MECHANICAL REQUIREMENTS150107

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!