12.07.2015 Views

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

Specifications - City of Montpelier, Vermont

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Title:<strong>Montpelier</strong> District Heating<strong>City</strong> <strong>of</strong> <strong>Montpelier</strong>, VT03050 – Concrete and Utility StructuresIssue Date:September 28, 2012Page #:3 <strong>of</strong> 81.4 SUBMITTALSA. The CONTRACTOR shall be required to provide the following shop drawings tothe OWNER for review and acceptance prior to constructing any precast or castinplace concrete utility structure. Shop drawings will be required for thefollowing types <strong>of</strong> structures, where applicable:1. Flash Chambers2. Storm and Sanitary Sewer Manholes3. Catch Basins4. Conduit System HandholesB. The CONTRACTOR shall anticipate up to 10 working days upon receipt <strong>of</strong> asubmittal for the OWNER to review shop drawings. Shop drawings will bereviewed, redlined, and returned to the CONTRACTOR with one <strong>of</strong> the followingnotes:1. Approved (or No Exception Noted): Where the submittal is marked“Approved”, the work covered by the submittal may proceed provided itcomplies with the contract documents. Final acceptance will depend onthat compliance.2. Approved as Noted (or Make Corrections Noted): Where the submittal ismarked “Approved as Noted”, the work covered by the submittal mayproceed provided it complies with the review comments noted on thesubmittal and the contract documents. Final acceptance will depend onthat compliance.3. Disapproved (or Rejected): Where the submittal is marked“Disapproved”, do not proceed with the work covered by the submittal,including purchasing, fabrication, delivery or other activity for the itemsubmitted. Prepare a new submittal according to the review commentsnoted on the submittal and meeting the contract documents.4. Returned for Correction (or Revise and Resubmit): Where the submittal ismarked “Returned for Correction”, do not proceed with the work coveredby the submittal, including purchasing, fabrication, delivery or otheractivity for the item submitted. Revise or prepare a new submittalaccording to the review comments noted on the submittal and meeting thecontract documents.5. Acknowledged: Where the submittal is marked “Acknowledged”, receipt<strong>of</strong> the submittal is acknowledged and has been recorded.CONCRETE AND UTILITY STRUCTURES030503

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!