28.08.2013 Views

2 - Fagor Automation

2 - Fagor Automation

2 - Fagor Automation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

10.17 On-the-fly start/delta connection switching on FM7 spindles, E03 & HS3 series<br />

POWER SUPPLY<br />

FAGOR<br />

PS-65A + APS24 (X2, X3 & X4) 24 V DC, 10 A<br />

PS-25B4 (X4, X5 & X6) 24 V DC, 10 A<br />

XPS-XX (X4, X5 & X6) 24 V DC, 8 A<br />

RPS-XX (X2) 24 V DC, 8 A<br />

OUTPUT 24 V DC<br />

24 V<br />

0 V<br />

Chassis<br />

F. H10/30<br />

DRIVE<br />

SPD<br />

U<br />

V<br />

W<br />

24 V (of the FAGOR power voltage)<br />

(*) WARNING. Never connect an external<br />

auxiliary power supply and a <strong>Fagor</strong> power<br />

supply at the same time.<br />

0 V (of the FAGOR power voltage) *<br />

THE STAR/DELTA<br />

SWITCH IS MANAGED<br />

BY THE PLC PROGRAM<br />

AT THE 8070 CNC<br />

POWER SUPPLY<br />

ADDRESS<br />

9<br />

8<br />

ADD MSB<br />

LINE TERM<br />

0<br />

CAN<strong>Fagor</strong><br />

INTERFACE<br />

<br />

CHASIS<br />

GND IN<br />

GND IN<br />

+24V IN<br />

SYSTEM<br />

READY<br />

OVER VOLTAGE<br />

+5V<br />

RESET<br />

GND<br />

CAN L<br />

SHIELD<br />

CAN H<br />

SHIELD<br />

GND<br />

CAN L<br />

SHIELD<br />

CAN H<br />

SHIELD<br />

7<br />

SYSTEM READY<br />

+5 OVER CURRENT<br />

+5 ERROR<br />

5<br />

B<br />

C<br />

4<br />

1<br />

D<br />

3<br />

F<br />

1 2<br />

01<br />

POWER<br />

X2<br />

X3<br />

X1<br />

MPC- 4xN 2<br />

STAR connection DELTA connection<br />

U V W U V W<br />

DIGITAL OUTPUT<br />

+24V<br />

O1<br />

O2<br />

O3<br />

O4<br />

O5<br />

O6<br />

O7<br />

O8<br />

GND<br />

+24V.<br />

O9<br />

O10<br />

O11<br />

O12<br />

O13<br />

O14<br />

O15<br />

O16<br />

GND<br />

DIGITAL INPUT<br />

N.C.<br />

I1<br />

I2<br />

I3<br />

I4<br />

I5<br />

I6<br />

I7<br />

I8<br />

GND<br />

N.C.<br />

I9<br />

I10<br />

I11<br />

I12<br />

I13<br />

I14<br />

I15<br />

I16<br />

GND<br />

REMOTE I/O<br />

Diagram of on-the-fly Y/D (start/delta) connection switching for FM7-XXXX-XXX-E03/HS3 motors.<br />

X1<br />

X2<br />

X1<br />

X2<br />

*<br />

K3<br />

K2<br />

K4<br />

A1<br />

A1<br />

K1<br />

- KA1 D3 - KA2 D4<br />

A2 Flywheel diode<br />

1N4934<br />

A2 Flywheel diode<br />

1N4934<br />

O10<br />

O11<br />

I10<br />

I11<br />

MCP- 4xN 1<br />

Auxiliary relays - KA3, - KA4. e.g. RP821024<br />

Flywheel diodes D3, D4. e.g. 1N4934<br />

K1<br />

K2<br />

A1<br />

- KA4 A2<br />

- KM1 contactor: I (KM1) > IN ( )<br />

- KM2 contactor: I (KM2) > (1/ 3)<br />

IN ( )<br />

Note. See these currents in chapter 6. Selection, of the FM7/FM9 motor manual.<br />

V1<br />

V2<br />

U2 W2<br />

U1 W1<br />

V1 W2<br />

V2 W1<br />

U1 U2<br />

U/U1V/V1 W/W1<br />

- KM1<br />

Delta<br />

M<br />

3<br />

X/U2 Y/V2 Z/W2<br />

MPC- 4xN 1<br />

D3<br />

- KA3<br />

MPC- 4xN 1<br />

A1<br />

A2<br />

D4<br />

Connection diagrams<br />

MPC- 4xN 1<br />

- KM2<br />

Star<br />

MPC- 4xN1<br />

24 V<br />

0 V<br />

0 V<br />

24 V<br />

0 V<br />

24 V<br />

24 V<br />

0 V<br />

EXTERNAL AUXILIARY<br />

POWER SUPPLY<br />

Important warnings.<br />

1. Either an external auxiliary power supply or a FAGOR power supply may be used to supply the 24 V DC. Never connect<br />

both at the same time !<br />

2. To brake the motor in a controlled way during a power failure, make sure that 24 V DC will be supplied to contactors -<br />

KM1 and - KM2 and relays - KA3 and - KA4. This situation is ensured if you have installed a FAGOR power supply next<br />

to an SPD modular drive. If you have installed an external auxiliary 24 V DC power supply, you must make sure that this<br />

condition is ensured.<br />

3. When using a compact SCD drive to govern a spindle motor, you must necessarily install an external auxiliary power<br />

supply to provide the 24 V DC. These compact drives do not have an output 24 V DC connector.<br />

Sizing of motor power cables.<br />

WARNING.<br />

If you decide to install an external auxiliary power supply, make<br />

sure that in case of a power outage, the 24 V DC are ensured<br />

to brake the motor under control preventing it from braking by<br />

inertia. Ignoring this warning may cause personal injury.<br />

Notes.<br />

The I/O selected in the figure have been chosen arbitrarily. In general any Ixx and Oxx may be used always matching<br />

the ones used in the PLC.<br />

It is very common to choose I1 and O1 for the external emergency. Therefore, we suggest not to use them for this application.<br />

If they are going to be used, make sure that they have not been set to be used as emergency input and output.<br />

Sizing of - KM1 and - KM2 power contactors.<br />

<br />

<br />

MPC- 4xN 1 N 1: section supporting I N ( )<br />

MPC- 4xN 2 N 2: section supporting I N ( )<br />

Note. See the necessary cable section according to table of the chapter 4. Installation of the FM7/FM9 motor manual.<br />

CONNECTION DIAGRAMS<br />

On-the-fly start/delta connection switching on FM7 spindles, E03 & HS3 series 10.<br />

DDS<br />

HARDWARE<br />

Ref.1307<br />

353

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!