02.05.2013 Views

Prognosemetoder – en oversikt - Telenor

Prognosemetoder – en oversikt - Telenor

Prognosemetoder – en oversikt - Telenor

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

fic models, traffic and congestion control mechanisms, resource<br />

allocation and dim<strong>en</strong>sioning methods for IN structured networks<br />

and associated SS No. 7 networks will be recomm<strong>en</strong>ded<br />

in the new E.7IN series and in revisions of E.723 and E.733.<br />

Signalling traffic issues for B-ISDN are included in the workplan.<br />

Mobile and UPT: Traffic <strong>en</strong>gineering aspects of networks supporting<br />

mobile and UPT services will be covered in the E.750<br />

series of Recomm<strong>en</strong>dations to be finalised in the 1994 <strong>–</strong> 96 time<br />

frame. The first recomm<strong>en</strong>dations in the series have already<br />

be<strong>en</strong> published. The series addresses initially circuit-switched<br />

traffic and common channel signalling traffic, whereas packetswitched<br />

connections will be dealt with later on. The teletraffic<br />

<strong>en</strong>gineering problems related to the interchange of messages<br />

required by UPT are addressed. Modelling of the traffic processes<br />

in the user and the control plane, grade of service<br />

requirem<strong>en</strong>ts, dim<strong>en</strong>sioning methods and measurem<strong>en</strong>ts methods<br />

will be covered in the E.750 series.<br />

Miscellaneous: Traffic <strong>en</strong>gineering for Public Switched Telephone<br />

Networks (PSTN) requires continuing developm<strong>en</strong>t to<br />

improve the effici<strong>en</strong>cy of network operation. There is ongoing<br />

work on dim<strong>en</strong>sioning circuit-groups with multi-slot bearer services.<br />

Traffic measurem<strong>en</strong>ts necessary for SS No. 7, N-ISDN,<br />

B-ISDN, IN and UPT are addressed.<br />

ETSI<br />

The work on traffic control in B-ISDN within ETSI is done by<br />

the Traffic Control and Resource Managem<strong>en</strong>t (TCR) group<br />

within NA5. This activity goes on in parallel with the corresponding<br />

activity within ITU-T SG 13, the same topics being<br />

discussed aiming at harmonised European positions.<br />

Release of the ETS “Requirem<strong>en</strong>ts for traffic control and<br />

resource managem<strong>en</strong>t of VP/VC cross-connected network” (VP<br />

= Virtual Path, VC = Virtual Channel) is scheduled for October<br />

1994, and the ETS “Traffic Control and Congestion Control in<br />

B-ISDN” <strong>en</strong>dorsing the second version of I.371 is expected to<br />

be released in December 1994.<br />

ATM Forum<br />

The ATM Forum is an organisation with the objective of accelerating<br />

the deploym<strong>en</strong>t of ATM products and services through<br />

rapid converg<strong>en</strong>ce of interoperability specifications and promotion<br />

of industry co-operation. The Traffic Managem<strong>en</strong>t Group is<br />

responsible for traffic control and network performance issues.<br />

The results so far are included in the ATM Forum User-Network<br />

Interface 3.0 specification and the ATM Forum Broadband<br />

Interconnection Interface (B-ICI) 1.0. The specifications<br />

are based on ITU-T Recomm<strong>en</strong>dation I.371, however, on some<br />

points these specifications are more detailed. As an example,<br />

the parameters Sustainable Cell Rate and Burst Tolerance are<br />

defined within the ATM Forum UNI Specification, while they<br />

are still being discussed within ITU-T. Furthermore, refer<strong>en</strong>ce<br />

traffic loads are defined for use wh<strong>en</strong> measuring the performance<br />

of a B-ICI link.<br />

EURESCOM<br />

There are traffic <strong>en</strong>gineering activities in the fields of ATM and<br />

IN within the EURESCOM institute.<br />

Traffic issues in ATM VP cross-connect networks have be<strong>en</strong><br />

considered in the finalised project P105 “European ATM Network<br />

Studies”, resulting in deliverables on Connection Acceptance<br />

Control (CAC), Network Parameter Control (NPC) and<br />

Dim<strong>en</strong>sioning. The CAC and NPC procedures specified are<br />

based on the declared peak cell rate, and are important input to<br />

the specification of the European ATM Pilot. Within the followup<br />

project P302 “European switched VC-based ATM Network<br />

Studies” (planned for the period September 1993 <strong>–</strong> November<br />

1995) the activity on resource allocation is aiming at defining<br />

more source traffic descriptors allowing for statistical multiplexing<br />

gain in the network. Guidelines for implem<strong>en</strong>tation and<br />

evaluation of the corresponding Usage Parameter Control<br />

(UPC), NPC and CAC procedures will be prepared. Possible<br />

b<strong>en</strong>efits with use of long buffers in the switches and corresponding<br />

buffer managem<strong>en</strong>t schemes will also be studied.<br />

Due to the planned developm<strong>en</strong>t of IN and the rapid implem<strong>en</strong>tation<br />

of services, the need for appropriate methods and tools<br />

for dim<strong>en</strong>sioning the IN infrastructure is recognised as very<br />

important. The objective of the project P308 “Methods for<br />

Tools to Dim<strong>en</strong>sion IN Networks”, planned for the period from<br />

September 93 to mid 95, is to determine g<strong>en</strong>eral methods in<br />

order to give guidelines to the network operators on how to<br />

dim<strong>en</strong>sion the differ<strong>en</strong>t elem<strong>en</strong>ts of an IN network (including<br />

the SS no 7 network). The topics include traffic models, congestion<br />

and load control, flow control parameters, dim<strong>en</strong>sioning<br />

methods and performance analysis. The quality of service<br />

aspects include both the delays of the call set-up phase and the<br />

probability of query rejection due to congestion in IN network<br />

elem<strong>en</strong>ts.<br />

RACE<br />

ISDN Traffic Modelling E.710 ...<br />

ISDN Dim<strong>en</strong>sioning<br />

E. 713<br />

E. 731<br />

E. 732<br />

E. 712<br />

E. 733<br />

E. 73x<br />

E. 73y<br />

Methods E.730 ...<br />

ISDN Traffic Performance E.720 ...<br />

The programme for Research and technology developm<strong>en</strong>t in<br />

advanced communications in Europe, the RACE programme, is<br />

divided into two main phases, Phase I from 1988 to 1992 and<br />

Phase II from 1992 to 1995. There are a lot of projects within<br />

the RACE programme having activities on traffic <strong>en</strong>gineering<br />

issues. In this survey we will focus on the main projects which,<br />

to the author's knowledge, have influ<strong>en</strong>ce on the developm<strong>en</strong>t<br />

of the ATM traffic field.<br />

R1022 ATD: “Technology for ATD” was one of the largest projects<br />

within the RACE I programme with ALCATEL as prime<br />

E. 711<br />

E. 7IN4<br />

E. 721<br />

Circuit-Switched<br />

Packet-Switched<br />

SSno7<br />

ATM<br />

IN<br />

E. 7IN2<br />

E. 74x<br />

E. 722<br />

E. 723<br />

E. 7IN1<br />

E. 743<br />

ISDN Traffic Measurem<strong>en</strong>ts E.740...<br />

The E.700 series of Recomm<strong>en</strong>dations<br />

189

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!