06.03.2013 Views

Controls, Start-Up, Operation, Service and ... - Climayoreo

Controls, Start-Up, Operation, Service and ... - Climayoreo

Controls, Start-Up, Operation, Service and ... - Climayoreo

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

On units equipped with optional supply fan <strong>and</strong>/or exhaust<br />

fan VFDs, the fan speed is controlled by a 3-phase VFD. The<br />

supply fan VFD is located in the supply fan section (030-050<br />

size units) or mixing box section (055-100 size units) behind an<br />

access door. For 075-100 size units with optional high-capacity<br />

power exhaust or return/exhaust fan, the exhaust fan VFD is located<br />

in the mixing box section behind an access door.<br />

The P-Series units use ABB VFDs. The VFDs communicate<br />

to the ComfortLink MBB over the local equipment network<br />

(LEN). The VFD speed is controlled directly by the<br />

ComfortLink controls over the LEN. The interface wiring for<br />

the VFDs is shown in Fig. A <strong>and</strong> the terminal designations are<br />

shown in Table A. The VFD has a keypad display panel that<br />

can be used for <strong>Service</strong> Diagnostics <strong>and</strong> setting the initial VFD<br />

parameters required to allow the VFD to communicate on the<br />

LEN. Additional VFD parameters are set by the ComfortLink<br />

controls <strong>and</strong> sent to the VFD over the LEN at power up of the<br />

VFD. The VFD faults can be reset with the VFD keypad or<br />

through the ComfortLink controls (AlarmsR.CUR =Yes).<br />

Table B outlines the VFD parameters required to initialize<br />

communication over the ComfortLink LEN. These parameters<br />

must be set correctly for any communications to occur. These<br />

APPENDIX D — VFD INFORMATION<br />

Table A — VFD Terminal Designations<br />

194<br />

parameters come preset from the factory. If the VFD is replaced,<br />

these parameters must be set at the initial power up of<br />

the drive. This can be accomplished by running the Carrier Assistant<br />

through the VFD keypad (see START UP WITH THE<br />

CARRIER ASSISSTANT section), or setting each of the parameters<br />

individually.<br />

After the parameters in Table B have been set, the ComfortLink<br />

controls configure the additional parameters listed in<br />

Tables C <strong>and</strong> D automatically. These parameter configurations<br />

are sent to the VFD at every power up. The parameters listed in<br />

Table C have corresponding ComfortLink configurations<br />

(ConfigurationS.VFD <strong>and</strong> ConfigurationE.VFD). The<br />

parameters in Table D are hard-coded to be set as listed.<br />

After configuration Tables C <strong>and</strong> D have been sent to the<br />

VFD, the drive continues to send <strong>and</strong> receive information from<br />

the ComfortLink controls. This information is outlined in Tables<br />

E <strong>and</strong> F. Table E lists the information the VFD sends to the<br />

ComfortLink controls, <strong>and</strong> Table F lists the information the<br />

ComfortLink controls send to the VFD. These tables are updated<br />

at every scan the ComfortLink controls perform of the LEN.<br />

This occurs approximately once every second.<br />

TERMINAL FUNCTION<br />

U1 Three-Phase Main Circuit Input Power Supply<br />

V1<br />

W1<br />

U2 Three-Phase AC Output to Motor, 0 V to Maximum Input Voltage Level<br />

V2<br />

W2<br />

X1-11 (GND) Factory-supplied jumper<br />

X1-12 (D-COM)<br />

X1-10 (+24 V) Factory-supplied jumper<br />

X1-13 (DI-1)<br />

X1-10 (+24 V) <strong>Start</strong> Enable 1 (Factory-supplied jumper). When opened the drive goes to emergency stop.<br />

X1-16 (DI-4)<br />

X1-28 (SCR) Factory wired for local equipment network LEN communication<br />

X1-29 (B+)<br />

X1-30 (B-)<br />

X1-31 (AGND)<br />

X1-32 (SCR)<br />

+24 V<br />

GND<br />

DCOM<br />

DI-1<br />

DI-2<br />

DI-3<br />

Terminal X1<br />

DI-4<br />

10 11 12 13 14 15 16 17 18 28 29 30 31 32<br />

DI-5<br />

DI-6<br />

Fig. A — VFD Wiring<br />

SCR<br />

B(+)<br />

A(-)<br />

AGND<br />

SCR<br />

LEN connection from ComfortLink

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!