<strong>BFT</strong> 02/2010<br />

Podium 7<br />

Fig. 1 Crack widths in the concrete caused during the shrinkage<br />

ring tests (left) shortly afer the occurrence of the cracking. SCLC<br />

without admixture after 15 days (center), SCLC with SRA2 after 40<br />

days (right).<br />

Abb. 1 Rissweiten am Beton der Schwindringversuche (links) kurz<br />

nach dem Auftreten der Rissbildung: SVLB ohne Zusatzmittel<br />

nach 15 Tagen (Mitte); SLVB mit SRA2 nach 40 Tagen (rechts).<br />

itself in the clearly delayed crack formation and narrower<br />

crack widths in the SCLC with SRA addition. While in the<br />

reference SCLC a continuous crack of 0.8-mm width occurred<br />

already at the age of 15 days, the fi rst shrinkage<br />

crack of only 0.2-mm width in the SRA-modifi ed SCLC<br />

occurred at the earliest at the age of 40 days.<br />

SCLC manufacture and pumping<br />

Pump tests were performed with SCLC manufactured in<br />

a 1-m³ ring pan mixer and a truck-mounted pump M28-4<br />

from Putzmeister with a delivery length of 28 m. The storage-moist<br />

lightweight aggregate was homogenized in the<br />

mixer and pre-moistened for 30 minutes. Subsequently,<br />

the remaining concrete components were added in the<br />

following sequence: sand, cement, fl yash, water, silica<br />

fume suspension and superplasticizer. The dry constituents<br />

were initially mixed with the pre-moistened lightweight<br />

aggregate concrete for 90 seconds. After that the<br />

liquid concrete components were successively added in to<br />

the running mixer. After the addition of all mix components,<br />

it was once again mixed for 180 seconds. The pump<br />

test was performed with centrifugal feed and a delivery<br />

capacity of approx. 8 to 10 m³/h. After about 10 minutes of<br />

concrete delivery, a pause of 10 minutes duration was inserted<br />

to fi nd out whether the lightweight concrete in the<br />

Gute Ideen<br />

für Leichtbeton<br />

Besuchen Sie uns!<br />

54. BetonTage<br />

9.-11. Februar TISCH 2010, Neu-Ulm 28+29<br />

TISCH 28<br />

Vorstoß in eine neue<br />

bauliche Dimension<br />

Liapor macht Leichtbeton fester,<br />

leichter, dichter, dauerhafter<br />

und dämmstärker. Auf Ihre<br />

Suche nach neuen konstruktiven<br />

Möglichkeiten halten wir<br />

verblüffende Antworten bereit.<br />

Liapor GmbH & Co. KG � Industriestr. 2 � D-91352 Hallerndorf<br />

Tel. 0 95 45/4 48-0 � Fax 0 95 45/ 4 48-80 � www.liapor.com<br />

Betont leicht.<br />

Ideal als Ausgangsstoff<br />

im Leichtbeton.<br />

Informationen<br />

direkt anfordern:<br />

Telefon 09545-448-0<br />

oder unter<br />

www.liapor.com<br />

für gute Ideen