I-4-1-2 Procedures — <strong>Aircraft</strong> <strong>Operations</strong> — <strong>Volume</strong> <strong>II</strong><br />

23/11/06<br />

1.5 PROCEDURE ALTITUDE/HEIGHT<br />

1.5.1 The aviation industry has identified that the majority <strong>of</strong> large aircraft accidents occur lined up with <strong>and</strong><br />

within 19 km (10 NM) <strong>of</strong> the l<strong>and</strong>ing runway. To support the Controlled Flight Into Terrain (CFIT) prevention<br />

initiatives, instrument approach charts shall not only provide altitudes/heights to ensure appropriate obstacle clearance<br />

but also procedure altitudes/heights. Procedure altitudes/heights are intended to place the aircraft above any minimum<br />

altitude associated with obstacle clearance <strong>and</strong> to support a stabilized prescribed descent gradient/angle in the final<br />

segment.<br />

1.5.2 All non-precision instrument approach procedures shall be developed to include not only the minimum<br />

altitudes/heights to ensure obstacle clearance, but also procedure altitudes/heights. Procedure altitudes/heights shall be<br />

developed to place the aircraft at altitudes/heights that would normally be flown to intercept <strong>and</strong> fly the prescribed<br />

descent gradient/angle in the final approach segment to a 15 m (50 ft) threshold crossing. In no case shall a procedure<br />

altitude/height be less than any OCA/H.<br />

1.6 TRACK GUIDANCE<br />

1.6.1 Track guidance should normally be provided for all phases <strong>of</strong> flight through the arrival, initial, intermediate,<br />

final <strong>and</strong> missed approach segments. When track guidance is provided, the appropriate segment shall lie within the<br />

established coverage <strong>of</strong> the navigation facility on which the track guidance is based.<br />

1.6.2 When track guidance is not provided the obstacle clearance area shall be exp<strong>and</strong>ed as prescribed for dead<br />

reckoning (DR) segments in Chapter 3, “Initial approach segment” <strong>and</strong> in Appendix A to Chapter 3, “Initial approach<br />

using dead reckoning (DR)”. Terminal area surveillance radar (TAR), when available, may be used to provide vectors<br />

to the final approach (see Part <strong>II</strong>, Section 2, Chapter 6, “SRE”). En-route surveillance radar (RSR) may be used to<br />

provide track guidance through initial approach segments up to <strong>and</strong> including the intermediate fix. Criteria for the<br />

construction <strong>of</strong> areas for missed approaches without track guidance are provided in Chapter 6, “Missed approach<br />

segment”.<br />

Note.— Detailed procedures regarding the use <strong>of</strong> primary radar in the approach control service are set forth in the<br />

PANS-ATM, Doc 4444, Procedures for Air Navigation Services — Air Traffic Management.<br />

1.7 VERTICAL GUIDANCE<br />

Optimum <strong>and</strong> maximum descent gradients are specified depending on the type <strong>of</strong> procedure <strong>and</strong> the segment <strong>of</strong> the<br />

approach. At least in the case <strong>of</strong> the final approach segment for non-precision approach procedures <strong>and</strong>, preferably, also<br />

for other approach segments where appropriate, the descent gradient(s) used in the construction <strong>of</strong> the procedure shall<br />

be published. Where distance information is available, descent pr<strong>of</strong>ile advisory information for the final approach<br />

should be provided to assist the pilot to maintain the calculated descent gradient. This should be a table showing<br />

altitudes/heights through which the aircraft should be passing at each 2 km or 1 NM as appropriate.<br />

1.8 CATEGORIES OF AIRCRAFT<br />

1.8.1 <strong>Aircraft</strong> performance differences have a direct effect on the airspace <strong>and</strong> visibility required for manoeuvres<br />

such as circling approach, turning missed approach, final approach descent <strong>and</strong> manoeuvring to l<strong>and</strong> (including base<br />

<strong>and</strong> procedure turns). The most significant factor in performance is speed. Accordingly, five categories <strong>of</strong> typical<br />

aircraft (see 1.8.4) have been established to provide a st<strong>and</strong>ardized basis for relating aircraft manoeuvrability to specific<br />

instrument approach procedures.