21.03.2013 Views

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Part <strong>II</strong> — Section 1, Chapter 5 <strong>II</strong>-1-5-7<br />

7.4 km (4.0 NM)<br />

Figure <strong>II</strong>-1-5-3. Intermediate approach area precision approach radar<br />

Final approach area<br />

Combined intermediate <strong>and</strong><br />

final approach area<br />

600 m<br />

Not greater than 28 km (15 NM)<br />

Note.— The length <strong>of</strong> the final approach area is limited by the<br />

convergence <strong>of</strong> the radar.<br />

1060m<br />

Initial part missed approach area<br />

Figure <strong>II</strong>-1-5-4. Final <strong>and</strong> initial missed approach areas precision approach radar<br />

D<br />

Start <strong>of</strong><br />

descent path<br />

Forlastpart<strong>of</strong>the<br />

final approach <strong>and</strong><br />

missed approach areas,<br />

see Figure <strong>II</strong>-1-5-4<br />

Runway<br />

Threshold<br />

23/11/06

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!