21.03.2013 Views

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Part <strong>II</strong> — Section 1, Chapter 5 <strong>II</strong>-1-5-5<br />

above any object in the intermediate phase <strong>of</strong> the missed approach area intersects in a horizontal line a vertical plane at<br />

right angles to the runway centre line <strong>and</strong> situated at the beginning <strong>of</strong> the intermediate phase <strong>of</strong> the missed approach<br />

area. The OCA/H shall also assure that MOC in the final phase <strong>of</strong> the missed approach is provided. See Part I,<br />

Section 4, Chapter 6.<br />

5.7.3 Obstacle clearance altitude/height<br />

The OCA/H published for the procedure shall be the higher <strong>of</strong> the values calculated in 5.6.3.1 <strong>and</strong> 5.7.2.1, but it shall<br />

not be less than 60 m (200 ft). See Figures <strong>II</strong>-1-5-1 <strong>and</strong> <strong>II</strong>-1-5-5.<br />

Table <strong>II</strong>-1-5-1. Minimum length <strong>of</strong> intermediate segment<br />

Intercept angle<br />

with localizer<br />

(degrees)<br />

Minimum distance between localizer<br />

<strong>and</strong> glide path interceptions<br />

Cat A to E Cat H<br />

0 – 15 2.8 km (1.5 NM) 2.8 km (1.5 NM)<br />

16 – 30 3.7 km (2.0 NM) 3.7 km (2.0 NM)<br />

31 – 60 4.6 km (2.5 NM) 3.7 km (2.0 NM)<br />

61 – 90 5.6 km (3.0 NM) 3.7 km (2.0 NM)<br />

23/11/06

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!