21.03.2013 Views

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>II</strong>-4-1-2 Procedures — <strong>Aircraft</strong> <strong>Operations</strong> — <strong>Volume</strong> <strong>II</strong><br />

1.2.1.3 Sector 2 procedure (<strong>of</strong>fset entry)<br />

a) Overhead the fix, the aircraft is turned onto a heading so that the track makes an angle <strong>of</strong> 30° from the<br />

reciprocal <strong>of</strong> the inbound track on the holding side; <strong>and</strong><br />

b) flown outbound:<br />

23/11/06<br />

1) for the appropriate period <strong>of</strong> time, where timing is specified; or<br />

2) until the appropriate DME distance is attained, where distance is specified; or<br />

3) where a limiting radial is also specified, either:<br />

i) until the radial is encountered; or<br />

ii) until the appropriate DME distance is reached, whichever occurs first; <strong>and</strong> then<br />

c) turned right to intercept the inbound track to the holding fix.<br />

1.2.1.4 Sector 3 procedure (direct entry)<br />

Overhead the fix, the aircraft is turned right <strong>and</strong> follows the holding pattern.<br />

1.2.1.5 Special VOR/DME holding entry procedure<br />

1.2.1.5.1 For entry into a VOR/DME holding pattern an entry radial to a secondary fix at the end <strong>of</strong> the outbound<br />

leg may be established (see Figure <strong>II</strong>-4-1-3 a) <strong>and</strong> b)). In this case Sector 1 <strong>and</strong> Sector 2 entries are not authorized.<br />

1.2.1.5.2 The holding pattern will be entered directly along the entry radial or by the Sector 3 entry procedure.<br />

Having reached the secondary fix, the aircraft will turn right <strong>and</strong> follow the holding pattern. In this case the entry radial<br />

shall be published <strong>and</strong> clearly depicted.<br />

1.2.2 Holding procedures<br />

1.2.2.1 After completion <strong>of</strong> the sector entry, <strong>and</strong> overhead the fix for the second time (or on completion <strong>of</strong> a<br />

subsequent holding pattern) the aircraft is turned to fly an outbound track:<br />

a) for the appropriate period <strong>of</strong> time, if timing is specified; or<br />

b) until the appropriate DME distance is reached if distance is specified; <strong>and</strong> that<br />

c) on completion <strong>of</strong> the outbound leg the aircraft will be positioned for the turn onto the inbound track,<br />

allowing for the effect <strong>of</strong> wind; <strong>and</strong> then<br />

turned to intercept the inbound track to the holding fix.<br />

1.2.2.2 See 1.3.2, “Timing <strong>and</strong> distance” for the application <strong>of</strong> timing <strong>and</strong> distance limitations.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!