21.03.2013 Views

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

I-3-3-14 Procedures — <strong>Aircraft</strong> <strong>Operations</strong> — <strong>Volume</strong> <strong>II</strong><br />

23/11/06<br />

* Track guidance shall be acquired not further than<br />

10.0 km (5.4 NM) after completion <strong>of</strong> the turn<br />

c<br />

d r<br />

K<br />

P<br />

d o<br />

Latest TP<br />

d r*<br />

150 m<br />

C/L<br />

DER<br />

TP<br />

15º<br />

Track guidance<br />

available beyond<br />

this line<br />

K<br />

Max* 10.0 km (5.4 NM)<br />

DR track<br />

Earliest turning point<br />

if turns before DER<br />

are not accommodated<br />

15º<br />

600 m Earliest TP<br />

(Normal departure)<br />

d o<br />

15º<br />

d o<br />

7.8º / 10.3º<br />

Parallel to<br />

DR track<br />

Figure I-3-3-10. Turning departure — turn at an altitude<br />

Track guidance available beyond this line<br />

Departure track<br />

3.7 km (2.0 NM)/VOR<br />

4.6 km (2.5 NM)/NDB<br />

VOR<br />

NDB<br />

7.8º / 10.3º<br />

Area which could be<br />

excluded if turns<br />

before DER are not<br />

accommodated

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!