21.03.2013 Views

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Part IV — Chapter 1 IV-1-11<br />

0.30 NM<br />

0.56 km<br />

0.30 NM<br />

0.56 km<br />

Wind spiral<br />

1.00 NM<br />

1.85 km<br />

0.90 NM<br />

1.67 km<br />

MAPt<br />

SOC<br />

c<br />

FAF<br />

15°<br />

MAPt<br />

tolerance<br />

15°<br />

Earliest “nominal track”<br />

Latest “nominal track”<br />

Turn at MAPt<br />

Note: No track specified to the MAHF<br />

Turning missed approach with turn more than 90°<br />

Figure IV-1-5. Turning missed approach with turn more than 90°<br />

MAHF<br />

4.63 km<br />

2.50 NM<br />

23/11/06

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!