21.03.2013 Views

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Part <strong>II</strong> — Section 1, Chapter 1, Appendix B <strong>II</strong>-1-1-App B-3<br />

f) GPWS modification;<br />

g) use <strong>of</strong> flight director/autopilot;<br />

h) engine spin-up time; <strong>and</strong><br />

i) Vat increase for h<strong>and</strong>ling considerations.<br />

3.2 Additional operational considerations for height loss margin<br />

In addition, the height loss margin may be inadequate unless operational consideration is given to configuration,<br />

engine-out operation, maximum tail wind — minimum head wind limits, GPWS, weather minima, visual aids <strong>and</strong> crew<br />

qualifications, etc.<br />

— — — — — — — —<br />

23/11/06

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!