21.03.2013 Views

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>II</strong>I-3-6-24 Procedures — <strong>Aircraft</strong> <strong>Operations</strong> — <strong>Volume</strong> <strong>II</strong><br />

23/11/06<br />

FAP<br />

2.5% approach surface<br />

extended to start <strong>of</strong> precision<br />

(segment)<br />

OCA/H<br />

Precision segment<br />

Figure <strong>II</strong>I-3-6-4. Precision segment<br />

Transitional surfaces 14.3%<br />

2% approach surface<br />

300 m (984 ft), or<br />

the minimum height for<br />

a turn, if applicable<br />

300 m above threshold<br />

2.5% missed<br />

approach surface<br />

Figure <strong>II</strong>I-3-6-5. Illustration <strong>of</strong> basic ILS surfaces<br />

as described in Part <strong>II</strong>I, Section 3, Chapter 6, 6.4.7.2<br />

300 m above threshold

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!