21.03.2013 Views

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Part <strong>II</strong> — Section 2, Chapter 3 <strong>II</strong>-2-3-3<br />

3.6.2 If the distance from the fix to the threshold exceeds 11 km (6 NM), obstacle clearance penalties will be<br />

incurred (see Part I, Section 4, Chapter 5, 5.4.5.2 b), “Excessive length <strong>of</strong> final approach”).<br />

3.7 MISSED APPROACH POINT (MAPt)<br />

The MAPt is located at the facility or defined by an adequate fix. The missed approach area shall commence at the<br />

MAPt.<br />

MAPt<br />

3.7 km<br />

(2.0 NM)<br />

Vor<br />

Distance to limit <strong>of</strong> area<br />

for reversal or racetrack procedure<br />

Secondary area<br />

Final<br />

Primary area<br />

Splay 7.8°<br />

Figure <strong>II</strong>-2-3-1. Final approach area (VOR)<br />

Limit <strong>of</strong> the primary area<br />

<strong>of</strong> the reversal or<br />

racetrack procedure<br />

Final approach<br />

begins at this point<br />

23/11/06

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!