21.03.2013 Views

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

I-4-3-App A-8 Procedures — <strong>Aircraft</strong> <strong>Operations</strong> — <strong>Volume</strong> <strong>II</strong><br />

23/11/06<br />

Table I-4-3-App A-3. Lengths <strong>of</strong> line D for types <strong>of</strong> facility <strong>and</strong> airspeed<br />

Facility D for IAS < 335 km/h (180 kt) D for IAS < 465 km/h (250 kt)<br />

VOR/VOR 55° 16 km (8.5 NM) 23 km (12.5 NM)<br />

VOR/DME 70° 12 km (6.5 NM) 18 km (9.5 NM)<br />

Table I-4-3-App A-4. Minimum length <strong>of</strong> the DR segment<br />

Start point defined by VOR intersection — Altitude: 1 500 m (5 000 ft)<br />

Angle <strong>of</strong> turn<br />

IAS<br />

km/h (kt)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!