21.03.2013 Views

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Part I — Section 4, Chapter 6 I-4-6-29<br />

A<br />

c(6s)<br />

Fix<br />

tolerance<br />

dz<br />

SOC<br />

r r<br />

TP<br />

K K<br />

MAPt<br />

FAF<br />

Figure I-4-6-18. Turning missed approach with TP fix <strong>and</strong><br />

return to the facility without track back<br />

r<br />

Centre line <strong>of</strong> the area<br />

associated with the<br />

navigation aid<br />

15°<br />

Tangent<br />

point to centre line<br />

<strong>of</strong> the area<br />

associated with the<br />

navigation aid<br />

Note.— No track back to the facility is specified.<br />

23/11/06

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!