21.03.2013 Views

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>II</strong>I-3-2-10 Procedures — <strong>Aircraft</strong> <strong>Operations</strong> — <strong>Volume</strong> <strong>II</strong><br />

23/11/06<br />

14.8 km<br />

(8 NM)<br />

9.3 km<br />

(5 NM)<br />

Figure <strong>II</strong>I-3-2-3. GNSS arrival criteria IAF within 30 NM (46 km) ARP : 8 NM ½ AW<br />

prior to 30 NM (46 km) from ARP then 5 NM ½ AW<br />

Note.— This example is based on 5 seconds roll anticipation 16 000 ft, 300 kt, 15° AOB, ISA + 10°C at en-route<br />

waypoint 15 000 ft, 250 kt, 25° AOB, ISA + 10°C at IAF.<br />

IAF<br />

30°<br />

46 km (30 NM) from ARP

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!