21.03.2013 Views

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

Aircraft Operations. Volume II - Construction of Visual and Instrument ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

I-4-6-28 Procedures — <strong>Aircraft</strong> <strong>Operations</strong> — <strong>Volume</strong> <strong>II</strong><br />

23/11/06<br />

A<br />

c(6s)<br />

dz<br />

SOC<br />

r r<br />

TP<br />

K K<br />

MAPt<br />

FAF<br />

Figure I-4-6-17. Turning missed approach with TP fix <strong>and</strong><br />

return to the facility with track back<br />

r<br />

30°<br />

15°<br />

Tangent<br />

point<br />

Parallel to nominal<br />

track back<br />

Outer edge <strong>of</strong> the area<br />

associated with the<br />

navigation aid<br />

When outer edge does not<br />

intercept 15°splay line, connect<br />

area from tangent point to<br />

abeam navigation aid<br />

Note.— The nominal track back to the facility is specified.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!