SECTION FOUR - SPATIAL POLICIES, KEY DIAGRAMS AND SUPPORTING DEVELOPMENT CONTROL POLICIES<br />

4.2.13 Affordable Housing for Local Need, Policy HOU/2 AFFORDABLE HOUSING FOR LOCAL NEED<br />

Rep No Name<br />

22390 Denbighshire County Council - Planning Policy (Ms Angela Loftus) [5171]<br />

Summary The amendments to policy HOU/2 (Affordable housing for local need), in respect of thresholds and quota, are noted and supported.<br />

People Type<br />

22376 Mrs Searl [5170]<br />

1 Support<br />

Summary As per comments made in relation to Policies DP/4 and DP/5 we support the acknowledgement within the policy that provision can be reduced/negotiated<br />

subject to development viability. It is noted that his is further supported as section 4.2.23.<br />

22336 Welsh Assembly Government (Mr Mark Newey) [2176]<br />

1 Object<br />

Summary The delivery of affordable housing remains a key Assembly Government priority, as well as being a priority issue for the local authority. Consequently, the<br />

Welsh Assembly Government seeks to ensure that all avenues have been explored to maximise the delivery of affordable housing, both in terms of the scale<br />

of overall housing provision and sites.<br />

Paragraph 4.2.14.1 of the plan identifies an affordable housing need of 8460 dwellings over the plan period, whilst the plan makes provision for 2200.<br />

A primary concern is how the heavy reliance on windfall housing sites in the plan will deliver the affordable housing target.<br />

Change Sought: Further explanation and clarity on how commuted sums will assist delivery, as well as evidence to demonstrate the financial levels sought, would<br />

be beneficial.<br />

The plan would benefit from further clarity on how affordable housing delivery could be enhanced through the additional provision (assuming the 30%<br />

provision sought in policy HOU/2 is applied) of approximately 330 units from the 1100 contingency sites, particularly reflecting that affordable housing is a<br />

priority issue for the plan.<br />

14136 Home Builders Federation Ltd (Mr Richard Price) [1934]<br />

1 Object<br />

Summary We have a number of concerns with Policy HOU/2:<br />

Part 1 - Specific concerns with the policy and assumptions<br />

The theory of Section 106 and Land Valuations<br />

Paragraph 2.14 - Good Practice Approach<br />

Relationship of the AHVA to the Policy<br />

Other Section 106 Costs<br />

Sustainable housing and the costs associated with provision.<br />

4.2.21 Local Connection Occupancy Cascade<br />

Paragraph 4.2.22.3<br />

Policy HOU/2 parts 3 and 4<br />

Section 2<br />

The additional requirements of development<br />

Exercise to determine the impact of the realities of development on viability and deliverability.<br />

Changes to Building Regulations<br />

The requirement for fire sprinklers in all new homes<br />

<strong>Site</strong> constraints and abnormals<br />

Cumulative impact of regulation and other requirements<br />

Change Sought: The affordable housing viability assessment should recognise that residential land will have an inherent value of its own and it is not suitable to link the value<br />

of residential land to the value of existing uses to artificially set what the Council believes the residential land value should be.<br />

The Affordable Housing Viability Assessment should be undertaken with a figure of £400k per acre, or £1m per hectare as the benchmark for<br />

assessing the viability of residential development.<br />

1<br />

Support<br />

The requirements of the Planning Obligations SPG should be given greater consideration in terms of the 'other planning obligations' figure within the AHVA, to<br />

ensure the £7,500 figure assumed is sound and robust.<br />

The AHVA should be redone and should include more up to date and robust figures on the costs of achieving Code for Sustainable Homes Level 4. The UK<br />

Zero Carbon Hub should be consulted in this respect.<br />

The AHVA should make an allowance for achieving the WAG's sustainable buildings target and the imminent increase to Part L of building regulations. In this<br />

context for Code for Sustainable Homes Level 3 plus 6 credits - the consensus from our member is that £8,000 per plot would represent the average<br />

cost. However, for the changes to Part L, the approximate costs agreed by WAG are roughly an extra £20,000 per plot above current build costs. This is<br />

explained in more detail in the next section.<br />

The suggestions that, the market will improve to counteract the costs of achieving improved environmental standards on developments and increasing the<br />

environmental standards of homes will increase the sale price are wholly unfounded and cannot be relied upon within the assessment. As such, these<br />

assumptions should be removed.<br />

Paragraph 4.2.21 should be removed<br />

The requirements of paragraph 4.2.22.3 should either be contained within the policy or removed<br />

Parts 3 and 4 of Policy HOU/2 are statements of intent and should be removed.<br />

In light of the evidence above, we do not believe the affordable housing Policy HOU/2 should be adopted in its current form. We believe it will have a<br />

detrimental impact on development viability and hence the delivery of housing in general in Conwy. The evidence base for the policy should be revisited and<br />

the issues within our representation above should be taken into account when undertaking the affordable housing viability assessment. The policy should then<br />

be re-drafted when this work has been completed.<br />

14447 Beech Developments (NW) Ltd (Mr Mike Roberts) [1966]<br />

1 Object<br />

Summary We do not object to the general principle of providing 30% affordable housing in relation to housing sites where it is viable to do so (in accordance with<br />

National Policy). However, we do object to the suggestion that affordable housing contributions should come from all sites, whatever their size.<br />

Proper analsis and justification should be given for a more appropriate threshold which will not discourage development in the way that the present proposal<br />

will.<br />

Change Sought: Proper analsis and justification should be given for a more appropriate threshold for affordable housing which will not discourage development in the way that<br />

the present proposal will.<br />

19169 Redrow (Ms Victoria Murray) [4513]<br />

Summary The housing land allocations in the Abergele, Towyn and Kinmel Bay area are insufficient to meeet the expressed need for affordable housing.<br />

Change Sought: Additional housing land should be allocated in this area.<br />

1<br />

Object<br />

334