B. When the project is in progress, the roofing system manufacturer (a<br />

representative of the manufacturer) will provide the following:<br />

1.9 JOB CONDITIONS<br />

1.10 WARRANTY<br />

1. Report progress <strong>and</strong> quality of the work as observed in order to ascertain that<br />

the roofing system has been installed according to their published<br />

specifications, st<strong>and</strong>ards <strong>and</strong> details.<br />

2. Report to the Architect in writing any failure or refusal of the Contractor to<br />

correct unacceptable practices called to the Contractor's attention.<br />

3. Confirm after completion that manufacturer has observed no applications<br />

procedures in conflict with the specifications other than those that may have<br />

been previously reported <strong>and</strong> corrected.<br />

A. Surfaces on which the roofing membrane system is to be applied shall be clean,<br />

smooth, dry, <strong>and</strong> free of fins, sharp edges, loose <strong>and</strong> foreign materials, oil <strong>and</strong><br />

grease.<br />

1. Before beginning work, a representative of the manufacturer shall examine the<br />

roof surfaces in order to ensure that the substrate is acceptable.<br />

2. Do not begin installation until all defective conditions have been corrected.<br />

3. All surface voids greater than 1/4" wide shall be properly filled with an<br />

acceptable fill material.<br />

B. Fire <strong>and</strong> Smoke Protection:<br />

1. Kettles shall be located so as to prevent damage to buildings or other<br />

property. They shall not be positioned on roof decks. Mops shall be spun at<br />

the end of work periods to separate the str<strong>and</strong>s, <strong>and</strong> shall be stored in that<br />

conditions to prevent spontaneous combustion. Fire extinguishers shall be<br />

provided near kettles for immediate use.<br />

A. The Contractor is to cover damages to the building resulting from failure to<br />

prevent penetration of water during construction.<br />

B. Applicator’s Warranty: At completion of project <strong>and</strong> prior to final acceptance, the<br />

roofing contractor shall furnish in writing <strong>and</strong> notarized, 5 copies of Roofing<br />

Contractor’s warranty for all work of the new roof system against both faulty<br />

material <strong>and</strong> workmanship <strong>and</strong> to be free of water leaks for work two (2) years<br />

from date of Owner’s acceptance.<br />

1. Address warranty to Owner <strong>and</strong> deliver to Architect for review <strong>and</strong> transmittal.<br />

2. During this two (2) year period, agree to remove, repair <strong>and</strong> replace all<br />

defects, defective materials <strong>and</strong> generally to maintain roofing system <strong>and</strong><br />

associated sheet metal <strong>and</strong> accessories in its original weathertight <strong>and</strong><br />

watertight condition, all without cost to Owner. Such warranty should reflect<br />

this paragraph verbatim <strong>and</strong> provisions of warranty as required by Close-out<br />

MAGH121038<br />

07 52 16-4 MODIFIED BITUMINOUS MEMBRANE ROOFING