15.01.2015 Views

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2. Provide “retention clips” at all areas of Type 2 (equal to Armstrong 414).<br />

2.2 CEILING SUSPENSION MATERIALS<br />

A. General: Comply with ASTM C635, as applicable to type of suspension system<br />

required for type of ceiling units indicated. Coordinate with other work supported<br />

by or penetrating through ceilings, including light fixtures <strong>and</strong> HVAC equipment.<br />

1. Structural Class: Intermediate-duty.<br />

B. Attachment Devices: Size for 5 times design load indicated in ASTM C635, Table<br />

1 Direct Hung. Hanger Wires-galvanized carbon steel, ASTM A641, soft temper,<br />

prestretched, yield-stress load of at least 3 times design load, but not less than 12<br />

gage (0.106").<br />

C. Edge Molding: provide manufacturer’s st<strong>and</strong>ard wall angle (7/8” hemmed angle<br />

molding) for edges of ceiling of material <strong>and</strong> finish to match exposed tee flanges in<br />

same space unless otherwise noted below.<br />

D. Exposed Suspension System: Manufacturer's st<strong>and</strong>ard exposed tees, cross tees<br />

<strong>and</strong> accessories of types indicated, with exposed cross tees coped to lay flush<br />

with main runners. Hot dipped galvanized steel on all surfaces of ceiling<br />

suspension system, including mouldings, trim <strong>and</strong> accessories.<br />

E. Suspension System:<br />

1. For “ACT1” <strong>and</strong> “ACT2” Ceilings:<br />

a. Prelude XL 15/16” Exposed Tee Grid System by Armstrong.<br />

b. Donn DX 15/16” Exposed Tee Grid System by USG.<br />

c. Classic Stab System 15/16” Exposed Tee Grid System by Certainteed.<br />

PART 3 – EXECUTION<br />

3.1 EXAMINATION<br />

A. Installer must examine conditions under which acoustical ceiling work is to be<br />

performed <strong>and</strong> must notify Contractor in writing of unsatisfactory conditions. Do<br />

not proceed with work until unsatisfactory conditions have been corrected in<br />

manner acceptable to installer.<br />

3.2 PREPARATION<br />

A. Measure each ceiling area <strong>and</strong> establish layout of acoustical units to balance<br />

border widths at opposite edges of each ceiling – in accordance with approved<br />

coordination layout drawing.<br />

MAHG121038 09 51 13 - 3 ACOUSTICAL PANEL CEILINGS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!