B. Carpet Edge Guard:<br />

1. Extruded or molded vinyl or rubber of same manufacturer of rubber base of<br />

approved size <strong>and</strong> profile; color to match rubber base.<br />

2. Provide at all locations where carpet meets sealed/stained concrete.<br />

C. Installation Adhesive: Water-resistant type as recommended by carpet<br />

manufacturer, <strong>and</strong> which complies with flammability requirements for installed<br />

carpet <strong>and</strong> which contains no asbestos, <strong>and</strong> complies with full warranty.<br />

D. Seaming Carpet: Seaming adhesive recommended by carpet manufacturer <strong>and</strong><br />

which contains no asbestos.<br />

E. Miscellaneous Materials: As recommended by manufacturers of carpet, <strong>and</strong> other<br />

carpeting products; <strong>and</strong> selected by installer to meet project circumstance <strong>and</strong><br />

requirements.<br />

PART 3 – EXECUTION<br />

3.1 INSTALLERS<br />

A. Installer must examine substrates for moisture content <strong>and</strong> other conditions under<br />

which carpeting is to be installed, <strong>and</strong> notify Contracting Officer <strong>and</strong> Contractor in<br />

writing of conditions detrimental to proper completion of the work. Do not proceed<br />

until unsatisfactory conditions have been corrected.<br />

B. Clear away debris <strong>and</strong> remove any cementitious deposits, <strong>and</strong> other foreign matter<br />

which could interfere with adhesive bond, from surfaces to receive carpeting;<br />

vacuum clean immediately before installation.<br />

C. Perform bond <strong>and</strong> moisture tests on concrete sub-floors to determine if surfaces<br />

are sufficiently cured <strong>and</strong> dry as well as to ascertain presence of curing<br />

compounds. Moisture that results must be submitted in writing to the Contracting<br />

Officer prior to start of installation.<br />

D. Sequence carpeting with other work so as to minimize possibility of damage <strong>and</strong><br />

soiling of carpet during remainder of construction period.<br />

3.2 INSTALLATION<br />

A. General:<br />

1. Comply with manufacturer's instructions <strong>and</strong> recommendations for seam<br />

locations <strong>and</strong> direction of carpet; maintain uniformity of direction <strong>and</strong> lay of<br />

pile. At doors, center seams under doors; do not place seams in traffic<br />

direction at doorways.<br />

2. Extend carpet under open-bottomed obstructions <strong>and</strong> under removable<br />

flanges <strong>and</strong> furnishings, <strong>and</strong> into adjoining alcoves <strong>and</strong> closets of each space.<br />

MAHG121038 09 68 00 -3 CARPETING