main ducts, branch main ducts, branch ducts <strong>and</strong> plenums for supply, return,<br />

exhaust, <strong>and</strong> plenum ductwork.<br />

It is acceptable for an entire duct system to be DALT'd instead of<br />

disassembling that system in order to DALT only the 20 percent portion<br />

specified above.<br />

3.3.4 DALT Testing<br />

Perform DALT on the HVAC duct sections of each system as selected by the<br />

COTR. Use the duct class, seal class, leakage class <strong>and</strong> the leak test<br />

pressure data indicated on the drawings, to comply with the procedures<br />

specified in SMACNA 1143.<br />

In spite of specifications of SMACNA 1143 to the contrary, DALT ductwork of<br />

construction class of 3-inch water gauge static pressure <strong>and</strong> below if<br />

indicated to be DALT'd. Complete DALT work on the COTR selected ductwork<br />

within 48 hours after the particular ductwork was selected for DALT.<br />

Separately conduct DALT work for large duct systems to enable the DALT work<br />

to be completed in 48 hours.<br />

3.3.5 Pre-final DALT Report<br />

3.3.6 Quality Assurance - COTR DALT Field Acceptance Testing<br />

In the presence of the COTR <strong>and</strong> TAB team field leader, verify for accuracy<br />

Pre-final DALT Report data selected by the COTR. For each duct system,<br />

this acceptance testing shall be conducted on a maximum of 50 percent of<br />

the duct sections DALT'd.<br />

Further, if any data on the Pre-final DALT report form for a given duct<br />

section is out-of-tolerance, then field acceptance testing shall be<br />

conducted on data for one additional duct section, preferably in the same<br />

duct system, in the presence of the COTR.<br />

3.3.7 Additional COTR Field Acceptance Testing<br />

If any of the duct sections checked for a given system are determined to<br />

have a leakage rate measured that exceeds the leakage rate allowed by SMACNA<br />

Leak Test Manual for an indicated duct construction class <strong>and</strong> sealant class,<br />

terminate data checking for that section. The associated Pre-final DALT<br />

Report data for the given duct system will be disapproved. Make the<br />

necessary corrections <strong>and</strong> prepare a revised Pre-final DALT Report.<br />

Reschedule a field check of the revised report data with the COTR.<br />

3.3.8 Certified Final DALT Report<br />

3.3.9 Prerequisite for TAB Field Work<br />

Do not commence TAB field work prior to the completion <strong>and</strong> approval, for all<br />

systems, of the Final DALT Report.<br />

3.4 TAB PROCEDURES<br />

Section 23 05 93 Page 7