flooring.<br />

1. MVER shall not exceed 5 lbs./1000 sq. ft./24 hrs.<br />

C. Do not proceed with flooring installation until results of moisture tests are<br />

acceptable. All test results shall be documented <strong>and</strong> retained.<br />

3.2 PREPARATION<br />

A. Prepare sub-floor surfaces as follows:<br />

1. S<strong>and</strong> or grind substrate, if required to provide smooth surface <strong>and</strong> to remove<br />

foreign materials which could interfere with adhesion.<br />

2. Use leveling <strong>and</strong> patching compounds as recommended by resilient flooring<br />

manufacturer for filling small cracks, holes <strong>and</strong> depressions in sub-floors.<br />

3. Broom clean or vacuum surfaces to be covered, <strong>and</strong> inspect sub-floor.<br />

B. Apply concrete slab primer, if recommended by flooring manufacturer, prior to<br />

application of adhesive. Apply in compliance with manufacturer’s directions.<br />

C. Start of flooring installation indicates acceptance of sub-floor conditions <strong>and</strong> full<br />

responsibility for completed work.<br />

3.3 INSTALLATION<br />

A. General:<br />

1. Install resilient flooring using method indicated in strict compliance with<br />

manufacturer’s current printed instructions <strong>and</strong> recommendations. Extend<br />

resilient flooring into toe spaces, door reveals, <strong>and</strong> into closets <strong>and</strong> similar<br />

openings.<br />

a. Install resilient edge strips as resilient flooring work progresses.<br />

2. Scribe, cut, <strong>and</strong> fit resilient flooring to permanent fixtures, built-in furniture <strong>and</strong><br />

cabinets, pipes, outlets, <strong>and</strong> permanent columns, walls, <strong>and</strong> partitions.<br />

3. Maintain reference markers, holes, or openings that are in place or plainly<br />

marked for future cutting by repeating on finish flooring as marked on subfloor.<br />

Use chalk or other non-permanent marking device.<br />

4. Tightly cement resilient flooring to sub-base without open cracks, voids,<br />

raising <strong>and</strong> puckering at joints, telegraphing of adhesive spreader marks, or<br />

other surface imperfections. H<strong>and</strong> roll resilient flooring at perimeter of each<br />

covered area to assure adhesion.<br />

B. Installation of Tile Floors:<br />

1. Install tile floors according to color <strong>and</strong> pattern plans on Drawings.<br />

MAHG121038 09 65 19 - 5 RESILIENT TILE FLOORING