15.01.2015 Views

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1.2 SUBMITTALS<br />

bronze <strong>and</strong> similar finished materials will not require finish painting,<br />

unless otherwise indicated.<br />

5. Operating Parts <strong>and</strong> Labels:<br />

a. Moving parts of operating units, mechanical <strong>and</strong> electrical parts, such as<br />

valve <strong>and</strong> damper operators, linkages, sinkages, sensing devices, motor<br />

<strong>and</strong> fan shafts will not require finish painting, unless otherwise indicated.<br />

Do not paint over any code-required labels, such as Underwriters'<br />

Laboratories <strong>and</strong> Factory Mutual, or any equipment identification,<br />

performance rating, name or nomenclature plates.<br />

6. Do not paint concrete or floors, unless specifically indicated.<br />

7. Gypsum wallboard joint preparation is included in Gypsum Wallboard Section.<br />

A. Product Data:<br />

1. Provide manufacturer's printed product data on all coatings specified,<br />

including preparation <strong>and</strong> application instructions.<br />

B. Selection Samples:<br />

1. Provide two sets of samples not less than one by two inches in size illustrating<br />

range of colors <strong>and</strong> textures available for each finishing product specified.<br />

C. Verification Samples:<br />

1. Provide two samples of not less than six inches square illustrating selected<br />

color <strong>and</strong> texture for each finishing product specified.<br />

1.3 QUALITY ASSURANCE<br />

A. Job Sample:<br />

1. Prior to start of painting, paint full size field sample of each individual color<br />

scheduled on each respective substrate. Paint sample at site, where directed,<br />

of workmanship to be expected in the completed work. Obtain Contracting<br />

Officer’s acceptance of the sample before start of work. If sample is<br />

accepted, the sample may become part of the finished project.<br />

1.4 DELIVERY, STORAGE, AND HANDLING<br />

A. Deliver materials to job site in original, new <strong>and</strong> unopened packages <strong>and</strong><br />

containers bearing manufacturer's name <strong>and</strong> label <strong>and</strong> following minimum<br />

information:<br />

1. Name or title of materials<br />

2. Manufacturer's name<br />

MAHG121038 09 90 0 - 2 PAINTING AND COATING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!