15.01.2015 Views

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

. The hardware shall perform the control sequences as specified <strong>and</strong> shown<br />

to provide control of the equipment as specified <strong>and</strong> shown.<br />

c. Control sequence logic shall reside in DDC hardware in the building.<br />

The building control network shall not be dependent upon connection to<br />

a Utility Monitoring <strong>and</strong> Control System (UMCS) for performance of<br />

control sequences in this specification. The hardware shall, to the<br />

greatest extent practical, perform the sequences without reliance on<br />

the building network.<br />

d. The hardware shall be installed such that individual control equipment<br />

can be replaced by similar control equipment from other equipment<br />

manufacturers with no loss of system functionality.<br />

e. All necessary documentation, configuration information, configuration<br />

tools, programs, drivers, <strong>and</strong> other software shall be licensed to <strong>and</strong><br />

otherwise remain with the Government such that the Government or their<br />

agents are able to perform repair, replacement, upgrades, <strong>and</strong><br />

expansions of the system without subsequent or future dependence on the<br />

Contractor.<br />

f. The Contractor shall provide sufficient documentation <strong>and</strong> data,<br />

including rights to documentation <strong>and</strong> data, such that the Government or<br />

their agents can execute work to perform repair, replacement, upgrades,<br />

<strong>and</strong> expansions of the system without subsequent or future dependence on<br />

the Contractor.<br />

g. Hardware shall be installed <strong>and</strong> configured such that the Government or<br />

their agents are able to perform repair, replacement, <strong>and</strong> upgrades of<br />

individual hardware without further interaction with the Contractor.<br />

h. Control hardware shall be installed <strong>and</strong> configured to provide all input<br />

<strong>and</strong> output St<strong>and</strong>ard Network Variables (SNVTs) as shown <strong>and</strong> as needed to<br />

meet the requirements of this specification.<br />

i. All DDC devices installed under this specification shall communicate<br />

via Bacnet MS/TP. The control system shall be installed such that a<br />

SNVT output from any node on the network can be bound to any other node<br />

in the domain.<br />

1.4.2 Verification of Dimensions<br />

After becoming familiar with all details of the work, the Contractor shall<br />

verify all dimensions in the field, <strong>and</strong> shall advise the Contracting Officer<br />

of any discrepancy before performing any work.<br />

1.4.3 Drawings<br />

The Government will not indicate all offsets, fittings, <strong>and</strong> accessories that<br />

may be required on the drawings. The Contractor shall carefully investigate<br />

the mechanical, electrical, <strong>and</strong> finish conditions that could affect the work<br />

to be performed, shall arrange such work accordingly, <strong>and</strong> shall provide all<br />

work necessary to meet such conditions.<br />

1.5 PROJECT SEQUENCING<br />

Section 23 09 23 Page 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!