2.5 FINISHES<br />

Phillips heads for exposed screws <strong>and</strong> bolts.<br />

B. Finish Hardware Preparation<br />

1. Prepare doors <strong>and</strong> frames to receive mortised <strong>and</strong> concealed finish hardware<br />

in accordance with final Finish Hardware Schedule <strong>and</strong> templates provided by<br />

hardware supplier. Comply with applicable requirements of ANSI A115 series<br />

specifications for door <strong>and</strong> frame preparation for hardware.<br />

2. Reinforce doors <strong>and</strong> frames to receive surface-applied hardware. Drilling <strong>and</strong><br />

tapping for surface-applied finish hardware may be done at project site.<br />

3. Locate finish hardware as shown on final shop drawings or, if not shown, in<br />

accordance with "Recommended Locations for Builder's Hardware", published<br />

by Door <strong>and</strong> Hardware Institute.<br />

A. Shop Paint:<br />

1. Clean, treat <strong>and</strong> paint exposed surfaces of steel door <strong>and</strong> frame units.<br />

2. Clean steel surfaces of mill scale, rust, oil, grease, dirt <strong>and</strong> other foreign<br />

materials before application of paint.<br />

3. Apply shop coat of prime paint of even consistency to provide a uniformly<br />

finished surface ready to receive finish paint.<br />

4. Prior to application of ANY hardware, finish coat shall be SHOP applied<br />

(frames may be field applied), primed with 2 coats of finish paint in accordance<br />

with Division 9 Section “Painting <strong>and</strong> Coating”. Hardware <strong>and</strong> doors are not to<br />

be installed until ALL painting has been completed.<br />

PART 3 – EXECUTION<br />

3.1 EXAMINATION<br />

A. Installer must examine substrate <strong>and</strong> conditions under which steel doors <strong>and</strong><br />

frames are to be installed <strong>and</strong> must notify Contractor in writing of any conditions<br />

detrimental to proper <strong>and</strong> timely completion of work. Do not proceed with work<br />

until unsatisfactory conditions have been corrected in manner acceptable to<br />

installer.<br />

3.2 INSTALLATION<br />

A. General<br />

1. Install st<strong>and</strong>ard steel doors, frames, <strong>and</strong> accessories in accordance with final<br />

shop drawings <strong>and</strong> manufacturer’s data, <strong>and</strong> as herein specified<br />

MAHG121038 08 11 13 - 4 HOLLOW METAL DOORS AND FRAMES