15.01.2015 Views

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SECTION 02 11 50 – ASBESTOS REMOVAL<br />

PART 1 – GENERAL<br />

1.1 SUMMARY<br />

A. This specification covers the removal of all ACM (asbestos containing material)<br />

indicated on the Drawings including, but not limited to:<br />

1. Floor tile <strong>and</strong> mastic.<br />

2. Prior to start of any ACM removal, Keesler AFB Asbestos Protocol <strong>and</strong> a<br />

Asbestos Abatement <strong>and</strong> Management Inspection Report must be submitted<br />

to the Contracting Officer.<br />

a. See forms attached at the end of this Section.<br />

3. See attached “Asbestos Report” at the end of this Section<br />

B. Work shall include furnishing all labor, materials, equipment <strong>and</strong> services required<br />

(in accordance with the requirements of EPA, OSHA, Mississippi DEQ, <strong>and</strong> other<br />

regulatory agencies) to properly complete the work in accordance with the contract<br />

documents.<br />

1.2 QUALIFICATIONS<br />

A. Asbestos Abatement Contractor, his superintendent <strong>and</strong> abatement workers shall<br />

be required to have current EPA-AHERA training <strong>and</strong> must be properly accredited<br />

<strong>and</strong> certified by the Mississippi Department of Environmental Quality.<br />

B. The Asbestos Abatement Contractor shall employ an Air Monitoring Professional<br />

which must be approved by the Government. Air monitoring shall be in strict<br />

accordance with OSHA <strong>and</strong> EPA AHERA requirements.<br />

1.3 TERMINOLOGY<br />

A. Authorized visitor - the Government, Contracting Officer, or a representative of any<br />

regulatory or other agency having jurisdiction over the project.<br />

B. Abatement - procedures to control fiber release from asbestos containing<br />

materials.<br />

C. Removal - all herein specified procedures necessary to strip all asbestos<br />

containing materials from the designated areas <strong>and</strong> to dispose of these materials<br />

at an acceptable site.<br />

D. Air Monitoring - the process of measuring the fiber content of a specific volume of<br />

air in a stated period of time.<br />

E. HEPA Vacuum Equipment - high efficiency particulate air (absolute) filtered<br />

vacuum equipment with a filter system capable of collecting <strong>and</strong> retaining asbestos<br />

MAHG121038 02 11 50 - 1 ASBESTOS REMOVAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!