15.01.2015 Views

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

with 40 CFR 61, B., 61.22, d.; shall be sent, immediately upon award of<br />

contract to:<br />

Mississippi Department of Environmental Quality<br />

P. O. Box 10385<br />

Jackson, MS 39209-0385<br />

with a copy of this notification to:<br />

Region IV<br />

Asbestos, Pesticide & Toxic Management<br />

USEPA<br />

345 Courtl<strong>and</strong> Street, N.E.<br />

Atlanta, GA 30365<br />

3. Submit proof satisfactory to the Government that all required permits, site<br />

location, <strong>and</strong> arrangements for transport <strong>and</strong> disposal of asbestos containing<br />

of contaminated materials, supplies <strong>and</strong> like have been obtained.<br />

4. Submit to the Contracting Officer a description of the plans for construction of<br />

decontamination enclosure systems <strong>and</strong> for isolation of the work areas in<br />

compliance with this specification <strong>and</strong> applicable regulations.<br />

5. Post caution signs in <strong>and</strong> around the work area as required by Federal, State<br />

regulations.<br />

1.2 PERSONNEL PROTECTION<br />

A. Prior to commencement of work, the workers shall be instructed, <strong>and</strong> shall be<br />

knowledgeable of all work <strong>and</strong> safety procedures.<br />

B. Provide workers with personally issued <strong>and</strong> marked respiratory equipment<br />

approved by NIOSH <strong>and</strong> OSHA <strong>and</strong> suitable for the asbestos exposure level in the<br />

work area according to OSHA St<strong>and</strong>ard 29 CFR 1910.1001(f) or applicable<br />

st<strong>and</strong>ard. Where respirators with disposable filter are employed, provide sufficient<br />

filters for replacement as required by the worker or applicable regulation.<br />

1. Types of respirators which are to be worn during area preparation <strong>and</strong> final<br />

clean up, <strong>and</strong> during removal of floor tile <strong>and</strong> mastic, shall be as follows:<br />

a. Power Air Purifying (PAPR)<br />

Protection Factor 100<br />

Positive pressure respirator<br />

High Efficiency Filter<br />

Half or full face piece<br />

C. Provide authorized visitors with suitable respirators with new filters or cartridges<br />

whenever they are required to enter the work area, to maximum of 4 per day.<br />

D. Provide workers with sufficient sets of disposable protective full body clothing.<br />

Such clothing shall consist of full body coveralls <strong>and</strong> headgear. Provide eye<br />

protection <strong>and</strong> hard hats as required by applicable safety regulations. Nondisposable<br />

type protective clothing shall be left in the Contaminated Equipment<br />

MAHG121038 02 11 50 - 4 ASBESTOS REMOVAL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!