15.01.2015 Views

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.5.3 Corrosion Resistant Sprinkler<br />

Corrosion resistant sprinkler shall be upright or pendent type installed in<br />

locations as indicated. Corrosion resistant coatings shall be factoryapplied<br />

by the sprinkler manufacturer.<br />

2.6 DISINFECTING MATERIALS<br />

2.6.1 Liquid Chlorine<br />

Liquid chlorine shall conform to AWWA B301.<br />

2.6.2 Hypochlorites<br />

Calcium hypochlorite <strong>and</strong> sodium hypochlorite shall conform to AWWA B300.<br />

2.7 ACCESSORIES<br />

2.7.1 Sprinkler Cabinet<br />

Spare sprinklers shall be provided in accordance with NFPA 13 <strong>and</strong> shall be<br />

packed in a suitable metal or plastic cabinet. Spare sprinklers shall be<br />

representative of, <strong>and</strong> in proportion to, the number of each type <strong>and</strong><br />

temperature rating of the sprinklers installed. At least one wrench of each<br />

type required shall be provided.<br />

2.7.2 Pendent Sprinkler Escutcheon<br />

Escutcheon shall be one-piece metallic type with a depth of less than 3/4<br />

inch <strong>and</strong> suitable for installation on pendent sprinklers. The escutcheon<br />

shall have a factory finish that matches the pendent sprinkler heads.<br />

2.7.3 Pipe Escutcheon<br />

Escutcheon shall be polished chromium-plated zinc alloy, or polished<br />

chromium-plated copper alloy. Escutcheons shall be either one-piece or<br />

split-pattern, held in place by internal spring tension or set screw.<br />

2.7.4 Sprinkler Guard<br />

Guard shall be a steel wire cage designed to encase the sprinkler <strong>and</strong><br />

protect it from mechanical damage. Guards shall be provided on sprinklers<br />

located as indicated.<br />

2.8 DOUBLE-CHECK VALVE BACKFLOW PREVENTION ASSEMBLY<br />

Double-check backflow prevention assembly is existing to remain .<br />

PART 3<br />

EXECUTION<br />

3.1 EXAMINATION<br />

After becoming familiar with all details of the work, verify all dimensions<br />

in the field, <strong>and</strong> advise the Contracting Officer of any discrepancy before<br />

performing the work.<br />

Section 21 13 17.00 10 Page 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!