. Do not shut down negative air system during encapsulating procedures,<br />

unless authorized by the Contracting Officer in writing.<br />

c. Start abatement work at a location farthest from the exhaust units <strong>and</strong><br />

proceed toward them. If an electric power failure occurs, immediately stop<br />

all abatement work <strong>and</strong> do not resume until power is restored <strong>and</strong> exhaust<br />

units are operating again.<br />

d. At completion of abatement work, allow exhaust units to run as required to<br />

remove airborne fibers that may have been generated during abatement<br />

work <strong>and</strong> cleanup <strong>and</strong> to purge the work area with clean make up air. The<br />

units may be required to run for a longer time after decontamination, if dry<br />

or only partially wetted asbestos material was encountered during any<br />

abatement work.<br />

8. Dismantling the System: When a final inspection <strong>and</strong> the results of final air<br />

tests indicate that the area has been decontaminated, exhaust units may be<br />

removed from the work area. Before removal from the work area, remove <strong>and</strong><br />

properly dispose of prefilter, <strong>and</strong> seal intake to the machine with 6 mil<br />

polyethylene to prevent environmental contamination from the filters.<br />

H. Asbestos abatement work shall not commence until:<br />

1. Arrangements have been made for disposal of waste an acceptable site.<br />

2. Arrangements have been made for containing <strong>and</strong> disposal of waste water<br />

resulting from wet stripping.<br />

3. Work areas <strong>and</strong> decontamination enclosure systems <strong>and</strong> parts of the building<br />

required to remain in use are effectively segregated.<br />

4. Negative air system is in place <strong>and</strong> properly operating.<br />

5. Tools, equipment <strong>and</strong> material waste receptors are on h<strong>and</strong>.<br />

6. Arrangements have been made for building security.<br />

7. All other preparatory steps have been taken <strong>and</strong> applicable notices posted <strong>and</strong><br />

permits obtained.<br />

3.2 REMOVAL OF ASBESTOS<br />

A. Removal of Vinyl Asbestos Floor Tile <strong>and</strong> Mastic (Category I Nonfriable ACM):<br />

1. Cover wall surfaces, up to 6 feet A.F.F., with 4 mil plastic sheeting sealed with<br />

tape.<br />

2. Establish negative pressure system as described in 3.01, G., above.<br />

3. Floor tiles shall not be allowed to become friable. Breakage shall be<br />

minimized. Contractor shall not use a mechanical chipper, <strong>and</strong> shall not saw,<br />

grind or s<strong>and</strong> ACM.<br />

MAHG121038 02 11 50 - 10 ASBESTOS REMOVAL