15.01.2015 Views

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Government approval is required for submittals with a "G" designation;<br />

submittals not having a "G" designation are for information only. When<br />

used, a designation following the "G" designation identifies the office that<br />

will review the submittal for the Government. The following shall be<br />

submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:<br />

SD-03 Product Data<br />

Water Chiller; G<br />

Manufacturer's st<strong>and</strong>ard catalog data, at least highlighted to<br />

show material, size, options, performance charts <strong>and</strong> curves, etc.<br />

in adequate detail to demonstrate compliance with contract<br />

requirements. Data shall include manufacturer's recommended<br />

installation instructions <strong>and</strong> procedures. Data shall be adequate<br />

to demonstrate compliance with contract requirements as specified<br />

within the paragraphs:<br />

a. Water Chiller<br />

b. Chiller Components<br />

c. Accessories<br />

If vibration isolation is specified for a unit, vibration isolator<br />

literature shall be included containing catalog cuts <strong>and</strong><br />

certification that the isolation characteristics of the isolators<br />

provided meet the manufacturer's recommendations.<br />

Posted Instructions<br />

Posted instructions, including equipment layout, wiring <strong>and</strong><br />

control diagrams, piping, valves <strong>and</strong> control sequences, <strong>and</strong> typed<br />

condensed operation instructions. The condensed operation<br />

instructions shall include preventative maintenance procedures,<br />

methods of checking the system for normal <strong>and</strong> safe operation, <strong>and</strong><br />

procedures for safely starting <strong>and</strong> stopping the system. The posted<br />

instructions shall be framed under glass or laminated plastic <strong>and</strong><br />

be posted where indicated by the Contracting Officer.<br />

Verification of Dimensions<br />

A letter including the date the site was visited, conformation of<br />

existing conditions, <strong>and</strong> any discrepancies found.<br />

Manufacturer's Multi-Year Compressor Warranty<br />

Manufacturer's multi-year warranty for compressor(s) in aircooled<br />

water chillers as specified.<br />

Factory Tests<br />

Schedules which identify the date, time, <strong>and</strong> location for each<br />

test. Schedules shall be submitted for both the Chiller<br />

Performance Test <strong>and</strong> the Chiller Sound Test.<br />

Section 23 64 10 Page 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!