TABLE I: PROJECT SEQUENCING lists the sequencing of submittals as specified<br />

in paragraph SUBMITTALS (denoted by an 'S' in the 'TYPE' column) <strong>and</strong><br />

activities as specified in PART 3: EXECUTION (denoted by an 'E' in the<br />

'TYPE' column).<br />

a. Sequencing for submittals: The sequencing specified for submittals is<br />

the deadline by which the submittal shall be initially submitted to the<br />

Government. Following submission there will be a Government review<br />

period as specified in Section 01 33 00 SUBMITTAL PROCEDURES. If the<br />

submittal is not accepted by the Government, the Contractor shall<br />

revise the submittal <strong>and</strong> resubmit it to the Government within 21 days<br />

of notification that the submittal has been rejected. Upon resubmittal<br />

there shall be an additional Government review period. If the<br />

submittal is not accepted the process repeats until the submittal is<br />

accepted by the Government.<br />

b. Sequencing for Activities: The sequencing specified for activities<br />

indicates the earliest the activity may begin.<br />

c. Abbreviations: In TABLE I the abbreviation AAO is used for 'after<br />

approval of' <strong>and</strong> 'ACO' is used for 'after completion of'.<br />

TABLE I. PROJECT SEQUENCING<br />

SEQUENCING<br />

(START OF ACTIVITY or<br />

ITEM # TYPE DESCRIPTION DEADLINE FOR SUBMITTAL)<br />

------ ---- ------------------------------ --------------------------<br />

2 S DDC Contractor Design Drawings<br />

3 S Manufacturer's Catalog Data<br />

6 E Install Building Control System AAO #1 thru #5<br />

7 E Start-Up <strong>and</strong> Start-Up Testing ACO #6<br />

9 S Programming Software days ACO #7<br />

12 S Start-Up <strong>and</strong> Start-Up days ACO #7<br />

Testing Report<br />

13 S Draft As-Built Drawings days ACO #7<br />

14 S PVT Procedures days before schedule<br />

start of #15 <strong>and</strong> AAO #12<br />

15 E PVT AAO #13 <strong>and</strong> #14<br />

16 S PVT Report days ACO #15<br />

19 S Final As-Built Drawings days AAO #16<br />

20 S O&M Instructions AAO #19<br />

23 S Closeout QC Checklist ACO #22<br />

before scheduled start<br />

of #22<br />

Section 23 09 23 Page 8