Contract Drawing with Contractor updated information <strong>and</strong> any other<br />

project-specific information required to implement the alarm h<strong>and</strong>ling<br />

function. A critical alarm h<strong>and</strong>ling schedule shall be submitted for<br />

each HVAC system.<br />

f. Equipment Schedule: The equipment schedule shall contain the unique<br />

identifier, manufacturer, model number, part number <strong>and</strong> descriptive<br />

name for each control device, hardware <strong>and</strong> component provided under<br />

this specification. An equipment schedule shall be submitted for each<br />

HVAC system.<br />

g. Occupancy Schedule: The occupancy schedule drawing shall contain the<br />

same fields as the occupancy schedule Contract Drawing with Contractor<br />

updated information. An occupancy schedule shall be submitted for each<br />

HVAC system.<br />

h. Points Schedule: The Points Schedule drawing shall contain the same<br />

fields as the Points Schedule Contract Drawing with Contractor updated<br />

information. A Points Schedule shall be submitted for each HVAC<br />

system.<br />

j. Riser diagram of building control network: The Riser Diagram of the<br />

Building Control Network shall show all network cabling, DDC Hardware,<br />

<strong>and</strong> Network Hardware including:<br />

(1) All DDC Hardware with room number <strong>and</strong> location within room.<br />

(2) DDC Hardware unique identifiers <strong>and</strong> common descriptive names.<br />

(3) All Network hardware with room number <strong>and</strong> location within room.<br />

(4) Network hardware unique identifiers.<br />

(5) All cabling.<br />

(6) Room number <strong>and</strong> location within room of all cabling termination<br />

points.<br />

(7) Room number <strong>and</strong> location within room of all network interface<br />

jacks.<br />

k. A single riser diagram shall be submitted for each building.<br />

l. Control System Schematics: The control system schematics shall be in<br />

the same form as the control system schematic Contract Drawing with<br />

Contractor updated information. A control system schematic shall be<br />

submitted for each HVAC system.<br />

m. Sequences of Operation including Control Logic Diagrams: The HVAC<br />

control system sequence of operation <strong>and</strong> control logic diagrams shall<br />

be in the same format as the Contract Drawings <strong>and</strong> shall refer to the<br />

devices by their unique identifiers. No operational deviations from<br />

specified sequences will be permitted without prior written approval of<br />

Section 23 09 23 Page 32