c. Insulation shall be impaled on the fasteners; self-locking washers<br />

shall be installed <strong>and</strong> the pin trimmed <strong>and</strong> bent over.<br />

d. Joints in the insulation jacket shall be sealed with a 4 inch wide<br />

strip of tape. Tape seams shall be sealed with a brush coat of vapor<br />

retarder coating.<br />

e. Breaks <strong>and</strong> ribs or st<strong>and</strong>ing seam penetrations in the jacket<br />

material shall be covered with a patch of the same material as the<br />

jacket. Patches shall extend not less than 2 inches beyond the break<br />

or penetration <strong>and</strong> shall be secured with tape <strong>and</strong> stapled. Staples <strong>and</strong><br />

joints shall be sealed with a brush coat of vapor retarder coating.<br />

f. At jacket penetrations such as hangers, thermometers, <strong>and</strong> damper<br />

operating rods, the voids in the insulation shall be filled <strong>and</strong> the<br />

penetrations sealed with a brush coat of vapor retarder coating.<br />

g. Insulation terminations <strong>and</strong> pin punctures shall be sealed <strong>and</strong><br />

flashed with a reinforced vapor retarder coating finish. The coating<br />

shall overlap the adjoining insulation <strong>and</strong> un-insulated surface 2<br />

inches. Pin puncture coatings shall extend 2 inches from the puncture<br />

in all directions.<br />

h. Oval <strong>and</strong> round ducts, flexible type, shall be insulated with<br />

factory Type I jacket insulation with minimum density of 3/4 pcf,<br />

attached as in accordance with MICA st<strong>and</strong>ards.<br />

3.3.3 Insulation for Warm Air Duct<br />

Insulation <strong>and</strong> vapor barrier shall be provided for the following warm air<br />

ducts <strong>and</strong> associated equipment:.<br />

a. Supply ducts.<br />

b. Return air ducts.<br />

c. Relief air ducts<br />

d. Flexible run-outs (field insulated).<br />

e. Plenums.<br />

f. Duct-mounted coil casings.<br />

g. Coil-headers <strong>and</strong> return bends.<br />

h. Coil casings.<br />

i. Fresh air intake ducts.<br />

j. Filter boxes.<br />

k. Mixing boxes.<br />

l. Supply fans.<br />