15.01.2015 Views

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Keesler AFB Asbestos Protocol<br />

Required Asbestos Abatement <strong>and</strong> Management Procedures<br />

These steps are in accordance with Air Force Instruction, EPA, <strong>and</strong> MDEQ. OSHA<br />

governs all worker safety <strong>and</strong> must be complied with by contractors <strong>and</strong> subcontractors.<br />

These requirements are summarized in the Keesler Air Force Base Asbestos Management<br />

<strong>and</strong> Operations Plan. Please reference Plan.<br />

These steps are required by all personnel or contractors doing work on Keesler Air Force<br />

Base.<br />

A. If the personnel or contractor encounters what they think may be asbestos, they are<br />

required to stop <strong>and</strong> call the KAFB Asbestos Point of Contact which is the Keesler<br />

Environmental Section. The section can be reached at 228-377-1262 during duty hours<br />

<strong>and</strong> 228-348-0864 during off hours.<br />

Thomas Minton is the Asbestos POC for the base <strong>and</strong> can be reached at the number<br />

above or at 228-348-0864 at anytime.<br />

B. Once it is determined by the Asbestos POC that asbestos is present, the following<br />

actions are required (Only the APOC <strong>and</strong> Bioenvironmental are certified to make that<br />

determination).<br />

NO ABATEMENT WORK IS TO BEGIN WITHOUT WRITTEN APPROVAL<br />

FROM THE APOC.<br />

A Mississippi State certified asbestos abatement contractor must be used to conduct the<br />

abatement. Please note that non-friable asbestos can easily be made friable <strong>and</strong> become<br />

regulated.<br />

The following documents must be submitted to the Asbestos POC <strong>and</strong> approved in<br />

writing before abatement can begin:<br />

1. 10 Day MDEQ notification <strong>and</strong> return acknowledgement letter<br />

2. Asbestos Hazard Abatement Plan (to be certified by a Mississippi Certified<br />

Management Planner <strong>and</strong> or Certified Industrial Hygienist )<br />

3. Asbestos Work Plan (scope of work, removal procedures, worker protection, air<br />

monitoring, disposal location, containment procedures)<br />

4. MDEQ Asbestos Abatement Certification for the Company<br />

5. Supervisors qualifications <strong>and</strong> state certification<br />

6. CURRENT State Certifications (applications will not be accepted) for all<br />

individuals working on site<br />

7. Respirator fit test for all individuals<br />

8. Physicals for all individuals

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!