3. Exterior sealant: Silicone Emulsion Sealant meeting ASTM C 920, Type S,<br />

Grade NS, compatible with glass fiber mesh tape <strong>and</strong> for covering exposed<br />

fasteners.<br />

4. Setting Type Joint Compound: Factory prepackaged, job mixed chemicalhardening<br />

powder products for bedding <strong>and</strong> filling.<br />

a. Provide equal to USG “Sheetrock Br<strong>and</strong> Easy S<strong>and</strong> Lightweight Setting-<br />

Type Joint Compound”.<br />

b. Use for all areas requiring setting or topping compound (ie: taping, filling,<br />

<strong>and</strong> treating fasteners).<br />

C. Fasteners: Steel drill screws, in lengths recommended by sheathing manufacturer<br />

for thickness of sheathing board to be attached, with organic-polymer or other<br />

corrosion-protective coating.<br />

1. For steel framing less than 0.0329 inch thick, attach sheathing with steel drill<br />

screws complying with ASTM C1002, St<strong>and</strong>ard Specification for Steel Self-<br />

Piercing Tapping Screws for the Application of Gypsum Panel Products or<br />

Metal Plaster Bases to Wood Studs or Steel Studs.<br />

2. For steel framing from 0.033 to 0.112 inch thick, attach sheathing with drill<br />

screws complying with “ASTM C954 St<strong>and</strong>ard Specification for Steel Drill<br />

Screws for the Application of Gypsum Panel Products or Metal Plaster Bases<br />

to Steel Studs from 0.033 in. to 0.112 in. in Thickness”.<br />

3. Provide Type S or Type S-12 screws only.<br />

PART 3 – EXECUTION<br />

3.1 PREPARATION<br />

A. Do not deliver or install gypsum board until building is fully enclosed, wet work is<br />

complete.<br />

B. Prior to finishing, HVAC system shall be operating <strong>and</strong> maintaining temperature<br />

<strong>and</strong> relative humidity at occupancy levels during the remainder of the construction<br />

period.<br />

3.2 EXAMINATION<br />

A. Examine substrates to which gypsum board construction attaches or abuts,<br />

installed hollow metal frames, cast-in anchors <strong>and</strong> structural framing with Installer<br />

present for compliance with requirements for installation tolerances <strong>and</strong> other<br />

conditions affecting performance of gypsum board assemblies specified in this<br />

Section.<br />

1. Do not proceed with installation until unsatisfactory conditions have been<br />

corrected.<br />

MAHG121038 09 29 00 - 4 GYPSUM BOARD