H. Warning Labels <strong>and</strong> Signs: As required by OSHA Regulation 29 CFR 1910.1001.<br />

I. Other Materials: Provide all other materials, such as timber, sheathing, nails <strong>and</strong><br />

hardware, which may be required to construct <strong>and</strong> dismantle the decontamination<br />

area <strong>and</strong> the barriers that isolate the work area.<br />

2.2 TOOLS AND EQUIPMENT<br />

A. Provide suitable tools for asbestos removal.<br />

B. Air movement equipment - High Efficiency Particulate Air Absolute Filtration<br />

Systems shall be equipped with filtration equipment in compliance with ANSI Z 9.2,<br />

Local Exhaust Ventilation. No air movement system shall discharge asbestos<br />

fibers outside the work area. Contractor shall be responsible for any licensing<br />

requirements for negative air system employed.<br />

PART 3 – EXECUTION<br />

3.1 PREPARATION<br />

A. Work Areas<br />

1. Shut down electric power. Provide temporary power <strong>and</strong> lighting <strong>and</strong> ensure<br />

safe installation of temporary power sources <strong>and</strong> equipment per applicable<br />

electrical code requirements <strong>and</strong> provide 24 V safety lighting <strong>and</strong> ground-fault<br />

interrupter circuits as power source for electrical equipment.<br />

2. Shut down <strong>and</strong> isolate heating, cooling, ventilating air systems to prevent<br />

contamination <strong>and</strong> fiber disposal to other areas of the structure. During the<br />

work, vents within the work area shall be sealed with tape <strong>and</strong> plastic sheeting.<br />

3. Clean the proposed work areas using HEPA filtered vacuum equipment or wet<br />

cleaning methods as appropriate. Methods that raise dust, such as dry<br />

sweeping or vacuuming with equipment not equipped with HEPA filters shall<br />

not be used.<br />

4. Seal off all openings, including but not limited to doorways, <strong>and</strong> any other<br />

penetrations of the work areas, with plastic sheeting sealed with tape.<br />

Doorways <strong>and</strong> corridors which will not be used for passage during work must<br />

be sealed with barriers as described in these specifications.<br />

5. Protection of Surfaces<br />

a. General: Cover floor <strong>and</strong> wall surfaces in area of ACM removal. Use a<br />

minimum of two layers of 6 mil polyethylene sheeting on the floor <strong>and</strong> two<br />

layers of 4 mil polyethylene sheeting on the walls. Install sheeting so that<br />

one layer of sheeting on both floor <strong>and</strong> walls can be removed, leaving one<br />

layer in place for cleaning prior to removal. Isolate all areas not to have<br />

ACM removed until pre-final clean air is achieved.<br />

6. Build airlocks at entrances to <strong>and</strong> exits from the work areas.<br />

MAHG121038 02 11 50 - 7 ASBESTOS REMOVAL