PART 3 – EXECUTION<br />

3.1 PRECONSTRUCTION FIELD-ADHESION TESTING<br />

A. Before installing sealants, field test their adhesion to Project joint substrates. Test<br />

joint sealants according to Method A, Field-Applied Sealant Joint H<strong>and</strong> Pull Tab, in<br />

Appendix X1 in ASTM C 1193 or Method A, Tail Procedure, in ASTM C 1521.<br />

3.2 EXAMINATION<br />

A. Inspect substrate surface to assure that no bond breaker materials contaminate<br />

the surface to which the sealant is to adhere <strong>and</strong> to ensure that unsound<br />

substrates are repaired. Installation of sealant shall be evidence of acceptance of<br />

the substrate.<br />

B. Verify joint dimensions prior to installation of the sealant to ensure that all<br />

dimensions are within tolerance established in the manufacturer's literature.<br />

Unacceptable variations shall be called to the Contracting Officer’s attention for<br />

resolution prior to installing any material.<br />

3.3 PREPARATION<br />

A. Clean joint surfaces immediately before installation of sealant or caulking<br />

compound. Remove dirt, insecure coatings, moisture <strong>and</strong> other substances which<br />

could interfere with bond of sealant or caulking compound. Etch concrete <strong>and</strong><br />

masonry joint surfaces as recommended by sealant manufacturer.<br />

B. Prime or seal joint surfaces where indicated, <strong>and</strong> where not indicated if<br />

recommended by sealant manufacturer, prior to installation of any backer rod or<br />

bond breaker tape. Do not allow primer/sealer to spill or migrate onto adjoining<br />

surfaces.<br />

3.4 INSTALLATION<br />

A. General: Comply with manufacturer's printed instructions, except where more<br />

stringent requirements are shown or specified, <strong>and</strong> except where manufacturer's<br />

technical representative directs otherwise.<br />

B. Set joint filler units full depth of joint or position in joint to coordinate with other<br />

work, including installation of backer rods <strong>and</strong> sealants. Do not leave voids or<br />

gaps between ends of joint filler units.<br />

C. Install sealant backer rod for liquid elastomeric sealants, except where shown to<br />

be omitted or recommended to be omitted by sealant manufacturer for application<br />

indicated in which case a bond breaker tape shall be used to prevent 3 sided<br />

adhesion. Apply backer rod using blunt or rounded tools which will ensure a<br />

uniform depth without puncturing the material. Use a rod oversized a minimum of<br />

33% for closed cell <strong>and</strong> 50% for open cell, unless otherwise required by the<br />

manufacturer.<br />

MAHG121038 07 92 00 - 3 JOINT SEALANTS