exterior of air distribution systems as specified under Section 23 07 00<br />

THERMAL INSULATION FOR MECHANICAL SYSTEMS.<br />

1.3.2 Water Distribution Systems<br />

TAB systems in compliance with this section. Obtain Contracting Officer's<br />

written approval before applying insulation to water distribution systems as<br />

specified under Section 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS.<br />

At Contractor's option <strong>and</strong> with Contracting Officer's written approval, the<br />

piping systems may be insulated before systems are TAB'd.<br />

Terminate piping insulation immediately adjacent to each flow control valve,<br />

automatic control valve, or device. Seal the ends of pipe insulation <strong>and</strong><br />

the space between ends of pipe insulation <strong>and</strong> piping, with waterproof vapor<br />

barrier coating.<br />

After completion of work under this section, insulate the flow control<br />

valves <strong>and</strong> devices as specified under Section 23 07 00 THERMAL INSULATION<br />

FOR MECHANICAL SYSTEMS.<br />

1.3.3 Related Requirements<br />

1.4 SUBMITTALS<br />

Government approval is required for submittals with a "G" designation;<br />

submittals not having a "G" designation are for information only. When<br />

used, a designation following the "G" designation identifies the office that<br />

will review the submittal for the Government. Submit the following in<br />

accordance with Section 01 33 00 SUBMITTAL PROCEDURES:<br />

SD-06 Test Reports<br />

DALT <strong>and</strong> TAB Work Execution Schedule; G<br />

DALT <strong>and</strong> TAB Procedures Summary; G<br />

Design review report; G<br />

Pre-Final DALT report; G<br />

Final DALT report; G<br />

TAB report for Season 1; G<br />

TAB report for Season 2; G<br />

SD-07 Certificates<br />

1.5 QUALITY ASSURANCE<br />

1.5.1 Independent Tab Agency <strong>and</strong> Personnel Qualifications<br />

To secure approval for the proposed agency, submit information certifying<br />

that the TAB agency is a first tier subcontractor who is not affiliated with<br />

any other company participating in work on this contract, including design,<br />

Section 23 05 93 Page 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!