Containment area <strong>and</strong> critical barriers secure<br />

Workers wearing personal protective equipment<br />

(PPE)<br />

Asbestos-containing material bagged appropriately<br />

Air monitoring conducted on workers<br />

Air monitoring conducted outside abatement area<br />

Daily log review (assurance of no uncertified<br />

individuals performing abatement work)<br />

Asbestos Abatement <strong>and</strong> Management<br />

Procedures<br />

Post - Job<br />

Asbestos POC <strong>and</strong> Bioenvironmental (when<br />

required) walk-though <strong>and</strong> approval of completed<br />

abatement & area cleaned of asbestos fibers<br />

(cleaning procedures in Asbestos Management <strong>and</strong><br />

Operations Plan)<br />

Air sampling results submitted for approval by<br />

asbestos POC prior to removal of containment area<br />

<strong>and</strong> critical barriers<br />

Asbestos waste h<strong>and</strong>led <strong>and</strong> disposed of in<br />

accordance with State law – asbestos POC must<br />

review waste prior to leaving<br />

Air Sampling Results<br />

Daily Report Logs<br />

Daily Worker Sign-In/Out Sheets<br />

Waste manifest (must be signed by KAFB personnel)<br />

Complete<br />

LEC/MSD Form #3 – 1/30/07