A. Install pipest<strong>and</strong>s <strong>and</strong> other supports on an additional sheet of finish ply as<br />

specified herein. Sheet shall be square <strong>and</strong> placed in line with the direction of the<br />

pipe.<br />

B. Spacing: Manufacturer’s recommended spacing is not to exceed 8 foot centers<br />

depending upon the load. Minimum of 2 per pipe or duct run.<br />

C. Provide aluminum pipe straps at all supports. “Zip-ties” will not be acceptable.<br />

3.8 WATER CUT-OFF<br />

A. At the end of the day's work, <strong>and</strong> when precipitation is eminent, a water cut-off<br />

shall be constructed at all open edges. Construct the cut-off with the same<br />

membrane <strong>and</strong> asphalt. Cut-off must be able to withst<strong>and</strong> extended periods of wet<br />

weather.<br />

3.9 ROOFING SAMPLES<br />

1. The water cut-off shall be completely removed prior to resuming the installation<br />

of the roofing system.<br />

A. If requested by Architect, Contractor shall cut <strong>and</strong> analyze roof samples.<br />

B. Two samples will be required for the first 100 squares <strong>and</strong> one sample for each<br />

additional 100 squares shall be taken at the time of Substantial Completion.<br />

C. Analysis of samples to be provided including determination of bitumen weight,<br />

number of piles <strong>and</strong> conditions of insulation.<br />

D. Sample size to 4 inches (minimum) by 36 inches must be replaced, with same<br />

material as originally provided in hot bitumen, if determined to be acceptable to<br />

Architect.<br />

3.10 FIELD QUALITY CONTROL (FINAL INSPECTION)<br />

A. Field inspections will be performed as outlined under “Quality Assurance”.<br />

B. At completion of roofing installation <strong>and</strong> associated work, meet with Contractor,<br />

Architect, installer, installer of associated work, Owner, <strong>and</strong> other representatives<br />

directly concerned with performance of roofing system.<br />

C. Walk roof surface areas of the building, inspect perimeter building edges as well<br />

as flashing of roof penetrations, walls, curbs <strong>and</strong> other equipment. List all items<br />

requiring correction or completion <strong>and</strong> furnish copy of list to each party in<br />

attendance.<br />

D. The roofing system manufacturer reserves the right to request a thermographic<br />

scan of the roof during final inspection to determine if any damp or wet materials<br />

have been installed. The thermographic scan shall be paid for <strong>and</strong> provided by the<br />

Contractor.<br />

MAGH121038<br />

07 52 16-13 MODIFIED BITUMINOUS MEMBRANE ROOFING