15.01.2015 Views

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.4 CLEANING<br />

2. Lay tile from center marks established with principal walls, discounting minor<br />

offsets, so that tile at opposite edges of room area are of equal width. Adjust<br />

as necessary to avoid use of cut widths less than 1/2 tile at room perimeters.<br />

Lay tile square to room axis, unless otherwise indicated on Drawings.<br />

3. Match tiles for color <strong>and</strong> pattern by using tile from cartons in same sequence<br />

as manufactured <strong>and</strong> packaged if so numbered. Cut tile neatly around all<br />

fixtures. Broken, cracked, chipped, or deformed tiles are not acceptable.<br />

a. Lay tile with grain running in one direction.<br />

4. Adhere tile flooring to substrates using full spread of adhesive applied in<br />

compliance with flooring manufacturer’s directions.<br />

5. Static Dissipative Tile only:<br />

C. Accessories:<br />

a. Install copper grounding strips into adhesive in strict accordance with<br />

manufacturer’s written instructions.<br />

1. Apply resilient base to walls, columns, pilasters, face of risers in stairways,<br />

casework <strong>and</strong> other permanent fixtures in rooms or areas where base is<br />

required. Install base in lengths as long as practicable, with field formed<br />

outside corner units, <strong>and</strong> with mitered or coped inside corners. Tightly bond<br />

base to backing throughout length of each piece, with continuous contact at<br />

horizontal <strong>and</strong> vertical surfaces.<br />

a. On irregular surfaces, fill voids along top edge of resilient wall base with<br />

manufacturer's recommended adhesive filler material.<br />

2. Apply edge strips where shown on drawings <strong>and</strong> at all exposed edges of<br />

resilient flooring. Secure units to substrate in compliance with manufacturer's<br />

recommendations.<br />

A. Perform following operations immediately upon completion of resilient flooring:<br />

1. Sweep or vacuum floor thoroughly.<br />

2. Do not wash floor until time period recommended by resilient flooring<br />

manufacturer has elapsed to allow resilient flooring to become well-sealed in<br />

adhesive.<br />

3. Damp-mop floor being careful to remove black marks <strong>and</strong> excessive soil.<br />

4. Remove any excess adhesive or other surface blemishes, using appropriate<br />

cleaner recommended by resilient flooring manufacturers.<br />

B. After completion of project <strong>and</strong> just prior to final inspection of work, apply polish<br />

<strong>and</strong> buff, with type of polish, MINIMUM 3 COATS, <strong>and</strong> buffing procedures in<br />

MAHG121038 09 65 19 - 6 RESILIENT TILE FLOORING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!