15.01.2015 Views

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

Specifications - Lord and Son Construction, Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

shall be made without prior approval of the Government. Any modifications<br />

made to the system shall be incorporated into the Operations <strong>and</strong> Maintenance<br />

Instructions, <strong>and</strong> other documentation affected.<br />

1.10 SURGE PROTECTION<br />

1.10.1 Power-Line Surge Protection<br />

Equipment connected to ac circuits shall be protected against or withst<strong>and</strong><br />

power-line surges. Equipment protection shall meet the requirements of IEEE<br />

C62.41.1, IEEE C62.41.2. Fuses shall not be used for surge protection.<br />

1.10.2 Surge Protection for Transmitter <strong>and</strong> Control Wiring<br />

DDC hardware shall be protected against or withst<strong>and</strong> surges induced on<br />

control <strong>and</strong> transmitter wiring installed outdoors <strong>and</strong> as shown. The<br />

equipment protection shall be protected against the following two waveforms:<br />

a. A waveform with a 10-microsecond rise time, a 1,000-microsecond decay<br />

time <strong>and</strong> a peak current of 60 amps.<br />

b. A waveform with an 8-microsecond rise time, a 20-microsecond decay time<br />

<strong>and</strong> a peak current of 500 amperes.<br />

1.11 INPUT MEASUREMENT ACCURACY<br />

Sensors, transmitters <strong>and</strong> DDC Hardware shall be selected, installed <strong>and</strong><br />

configured such that the maximum error of the measured value at the SNVT<br />

output of the DDC hardware is less than 150% of the maximum allowable error<br />

specified for the sensor or instrumentation.<br />

1.12 BUILDING CONTROL NETWORK<br />

The building control network shall consist of a backbone <strong>and</strong> one or more<br />

local control busses as specified. The DDC system shall be an extension of<br />

the existing Metasys ADX server. The application specific controllers used<br />

for this project shall perfectly match the application specific controllers<br />

used in the building 0308 building renovation.<br />

1.12.1 Backbone Media<br />

The backbone shall be a TP/FT-10 network in accordance with CEA-709.3 or an<br />

IP network according to the following criteria:<br />

b. The backbone shall be a TP/FT-10 network otherwise.<br />

1.12.2 Control Network Requirements<br />

The control network shall meet the following requirements:<br />

a. The backbone shall have no control devices connected to it.<br />

b. The backbone shall be installed such that a router at the Building Point<br />

of Connection (BPOC) location as shown may be connected to the<br />

backbone.<br />

Section 23 09 23 Page 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!