APPENDIX A<br />

QC CHECKLIST<br />

This checklist is not all-inclusive of the requirements of this specification<br />

<strong>and</strong> should not be interpreted as such.<br />

This checklist is for (check one:)<br />

Pre-<strong>Construction</strong> QC Checklist Submittal (Items 1-5)<br />

|____|<br />

Post-<strong>Construction</strong> QC Checklist Submittal (Items 1-12) |____|<br />

Close-out QC Checklist Submittal (Items 1-19)<br />

|____|<br />

Initial each item in the space provided (|____|) verifying that requirement<br />

has been met.<br />

Items verified for Pre-<strong>Construction</strong>, Post-<strong>Construction</strong> <strong>and</strong> Closeout QC<br />

Checklists Submittal:<br />

1 Network b<strong>and</strong>width calculations have been performed, |____|<br />

<strong>and</strong> the backbone type (Ethernet or TP/FT-10) has been<br />

determined based on these calculations.<br />

2 All DDC Hardware (nodes) are numbered on Control System |____|<br />

Schematic Drawings.<br />

3 Signal lines on Control System Schematic are labeled with |____|<br />

the signal type.<br />

4 Local Display Panel (LDP) Locations are shown on Control |____|<br />

System Schematic drawings.<br />

5 Points Schedule drawings have been sub-divided by device (DDC |____|<br />

Hardware), including DDC Hardware node numbers.<br />

Items verified for Post-<strong>Construction</strong> <strong>and</strong> Closeout QC Checklist Submittal:<br />

6 All DDC Hardware is installed on a TP/FT-10 local control |____|<br />

bus.<br />

7 All Application Specific Controllers (ASCs) are BACnet |____|<br />

certified.<br />

8 Communication between DDC Hardware is only via CEA-709.1B |____|<br />

using SNVTs. Other protocols <strong>and</strong> network variables other<br />

than SNVTs have not been used.<br />

9 Explicit messaging has not been used. |____|<br />

10 System Scheduler functionality has been installed for all |____|<br />

HVAC systems <strong>and</strong> default schedules have been configured at<br />

each System Scheduler.<br />

11 All sequences are performed as specified using DDC Hardware. |____|<br />

12 Training schedule <strong>and</strong> course attendee list has been |____|<br />

Section 23 09 23 Page 47