degrees F heat-resisting paint applied to a total minimum dry film<br />

thickness of 2 mils.<br />

3.8 TESTS, FLUSHING AND DISINFECTION<br />

3.8.1 Plumbing System<br />

The following tests shall be performed on the plumbing system in accordance<br />

with , except that the drainage <strong>and</strong> vent system final test shall include the<br />

smoke test. The Contractor has the option to perform a peppermint test in<br />

lieu of the smoke test. If a peppermint test is chosen, the Contractor must<br />

submit a testing procedure to the Contracting Officer for approval.<br />

a. Drainage <strong>and</strong> Vent Systems Test. The final test shall include a smoke<br />

test.<br />

b. Building Sewers Tests.<br />

c. Water Supply Systems Tests.<br />

3.8.1.1 Test of Backflow Prevention Assemblies<br />

Backflow prevention assembly shall be tested using gauges specifically<br />

designed for the testing of backflow prevention assemblies.<br />

Backflow prevention assembly test gauges shall be tested annually for<br />

accuracy in accordance with the requirements of State or local regulatory<br />

agencies. If there is no State or local regulatory agency requirements,<br />

gauges shall be tested annually for accuracy in accordance with the<br />

requirements of University of Southern California's Foundation of Cross<br />

Connection Control <strong>and</strong> Hydraulic Research or the American Water Works<br />

Association Manual of Cross Connection (Manual M-14), or any other approved<br />

testing laboratory having equivalent capabilities for both laboratory <strong>and</strong><br />

field evaluation of backflow prevention assembly test gauges.. Report form<br />

for each assembly shall include, as a minimum, the following:<br />

Data on Device<br />

Type of Assembly<br />

Manufacturer<br />

Model Number<br />

Serial Number<br />

Size<br />

Location<br />

Test Pressure Readings<br />

Data on Testing Firm<br />

Name<br />

Address<br />

Certified Tester<br />

Certified Tester No.<br />

Date of Test<br />

Serial Number <strong>and</strong> Test Data of<br />

Gauges<br />

If the unit fails to meet specified requirements, the unit shall be repaired<br />

<strong>and</strong> retested.<br />

3.8.1.2 Shower Pans<br />

After installation of the pan <strong>and</strong> finished floor, the drain shall be<br />

temporarily plugged below the weep holes. The floor area shall be flooded<br />

with water to a minimum depth of 1 inch for a period of 24 hours. Any drop<br />

in the water level during test, except for evaporation, will be reason for<br />

rejection, repair, <strong>and</strong> retest.<br />