NAVY SCHOOL MANAGEMENT MANUAL
NAVY SCHOOL MANAGEMENT MANUAL - AIM
NAVY SCHOOL MANAGEMENT MANUAL - AIM
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Scheduling of tests administered in the course and the<br />
objectives measured by each test.<br />
Types of tests and methods used to determine student's<br />
grade.<br />
<br />
<br />
Comprehensive testing will be used to measure<br />
accomplishment and/or retention of critical<br />
objectives.<br />
If unable to administer comprehensive test(s),<br />
justification should be outlined in the testing plan.<br />
<br />
<br />
Grading and weighting criteria for the final course grade.<br />
Review, remediation, and retesting procedures.<br />
<br />
<br />
<br />
Specific procedures for the review of a test will be<br />
outlined in the administrators guide. In the testing<br />
plan, list general statements as to how each missed<br />
item will be reviewed without compromising the test.<br />
Remediation and retesting will occur when an objective<br />
and/or test is failed. In the testing plan, list all<br />
methods used to remediate failed objectives and/or<br />
failed tests. Describe procedures formal, informal,<br />
oral, etc., to retest the student after remediation.<br />
Refer to Appendix C for acceptable methods of<br />
remediation and retesting.<br />
<br />
<br />
<br />
Testing constraints or any situation that prevents the<br />
testing of the objectives as stated. Testing constraints<br />
may be manpower, equipment, space, etc. Within this<br />
section, explain what action has been taken to eliminate<br />
the constraint.<br />
Method used to assign numerical grades to performance<br />
tests. This requires an explanation of the grading<br />
criteria for performance tests. A copy of the checklist<br />
and/or grading criteria may be adequate.<br />
Courses with SAT/UNSAT grading criteria will provide an<br />
explanation of how the grade is determined. Critical areas<br />
and sub-areas must be identified to the trainee.<br />
1.4. Testing Program Responsibilities<br />
<br />
<br />
CCAs are responsible for resolving any differences between<br />
the CCMM and the participating activity.<br />
Training Managers are responsible for monitoring the<br />
testing programs at the training activities. LS/DET LSOs<br />
shall provide IS training as required.<br />
5-4<br />
NAVEDTRA 135C