PART 2 - TESTING PROGRAMS (SAMPLE)<br />
In this section, review the testing plan, test item bank,<br />
performance/knowledge tests, and grading criteria.<br />
YES NO NA<br />
A. TESTING PLAN<br />
1. Testing Plan is on File and approved.<br />
2. The objectives are tested as per the testing<br />
plan.<br />
3. Comprehensive testing is being conducted.<br />
4. The testing procedures are consistent with<br />
Approved testing plan.<br />
B. TEST DESIGN AND DEVELOPMENT<br />
1. Minimum passing grade for a test established.<br />
2. The number of different test versions is adequate<br />
to prevent compromise.<br />
3. There is an equal degree of difficulty between<br />
versions.<br />
4. There is an adequate number of items on the test<br />
to measure the objective(s).<br />
5. Types of items and degree of difficulty are<br />
consistent with the objectives.<br />
6. Test design has been approved by the CCMM.<br />
7. Tests are developed as per the approved test<br />
design.<br />
8. Tests used for retest contain items that are<br />
different from the original version.<br />
C. KNOWLEDGE TEST ITEM BANKS<br />
1. Test item banks are maintained.<br />
2. Test items are constructed per NAVEDTRA<br />
curriculum development standards.<br />
3. Test items are approved by the CCMM.<br />
4. Test item is keyed to objective/PPP item it<br />
measures.<br />
5. Procedures for changing test bank are adequate.<br />
D. PERFORMANCE TESTING<br />
1. Performance testing is being conducted.<br />
2. Rating scales and/or checklists are used<br />
appropriately to evaluate the performance tests.<br />
3. Weighting of performance tests for the overall<br />
grade is consistent with the course objectives.<br />
E. TEST ADMINISTRATION<br />
1. Test Administrator Guides are clear and exact.<br />
2. Test administration procedures are adequate to<br />
prevent test compromise.<br />
3. Procedures for test security are adequate.<br />
4. Test review procedures are in accordance with the<br />
approved testing plan.<br />
F. TEST ANALYSIS<br />
1. Test item analysis is being conducted.<br />
2. Test analysis results are being used to improve<br />
the training.<br />
3. Changes based on the analysis are adequately<br />
documented.<br />
NETC 1540/5 (Rev. 3-10) PAGE 3 OF 7<br />